ENVIRONMENTAL MANAGEMENT AND MITIGATION: ENBRIDGE NORTHERN GATEWAY PIPELINES PROJECT

机译:环境管理与缓解:桥接北通道管道项目

获取原文

摘要

The Northern Gateway Pipelines project drew more attention from the Canadian public than most in recent Canadian history. Northern Gateway has proposed to construct and operate an oil pipeline, a condensate pipeline, associated facilities, two tunnels, powerlines, multiple pump stations, a land tank terminal, and a marine transportation terminal to be located near Kitimat, British Columbia. Not since the Canadian Pacific Railway has a project raised the interest of Canadians. The regulatory review and assessment process for Northern Gateway was extensive. The Canadian government established a Joint Review Panel to preside over the assessment and review process. To ensure that stakeholders and potentially affected aboriginal communities were heard, the Panel embarked on an extensive public hearing and consultation program. They received thousands of letters of interest, and 4,300 requests for public statements. The Panel heard from approximately 1,200 registered participants in 19 locations. The regulatory hearings spanned a period from September 2012 to June 2013. Opposition to the project stemmed primarily from concerns about the effect of oil spills on freshwater and marine environments and human use. Others were concerned about the expanded development of oil sands. The environmental assessment undertaken by Northern Gateway was extensive, as was the mitigation proposed by the project to avoid or minimize environmental effects resulting from the project. The project incorporated new and innovative approaches to minimize environmental effects. The paper introduces the project and the latter part discusses the extraordinary measures proposed and undertaken to minimize potential risks to the environment.
机译:北部门户管道项目比最近加拿大历史上的大多数吸引了加拿大公众的更多关注。 Northern Gateway已提议在不列颠哥伦比亚省基蒂马特附近建设和运营一条输油管道,一条冷凝水管道,相关设施,两条隧道,电力线,多个泵站,一个陆上坦克码头和一个海上运输码头。自从加拿大太平洋铁路(Canadian Pacific Railway)开展项目以来,加拿大人就没有对此感兴趣。 Northern Gateway的监管审查和评估过程非常广泛。加拿大政府成立了联合审核小组,负责评估和审核程序。为确保听取利益相关者和可能受影响的原住民社区的意见,专家小组着手进行了广泛的公众听证和咨询计划。他们收到了数千封意向书,并收到了4,300份公开声明请求。小组听取了19个地点的大约1,200名注册参与者的声音。监管听证会的时间跨度为2012年9月至2013年6月。反对该项目的主要原因是人们担心漏油对淡水和海洋环境以及人类使用的影响。其他人则关注油砂的扩展发展。 Northern Gateway进行的环境评估是广泛的,项目所建议的缓解措施是为了避免或最小化项目所造成的环境影响。该项目采用了新的创新方法,以最大程度地减少环境影响。本文介绍了该项目,后一部分讨论了为减少对环境的潜在风险而提出和采取的非凡措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号