【24h】

Network connection codes implementation process

机译:网络连接代码实现过程

获取原文

摘要

Network codes are a set of rules drafted by ENTSO-E, with guidance from the Agency for the Cooperation of Energy Regulators, to facilitate the harmonisation, integration and efficiency of the European electricity market. The contracting parties of the Energy Community will have to harmonize national network codes with the codes in European Union under the obligations coming from “Third Energy Package”. The network codes cover three key areas of the European electricity transmission sector: grid connections, grid operations and cross-border electricity markets. There are three Connection Network Codes which need to be implemented in the national Grid code: Requirements for generators, Demand connection code and a network code on requirements for grid connection of high voltage direct current systems. The Network Code on Requirements for Generators sets out the rules that new generators must adhere in order to connect to the transmission system. The code provides guidance on the way requirements will be implemented and sets ranges within which values must be chosen. The chosen values will be discussed during the national implementation process. By creating a clear pan European framework of capabilities which generators will provide TSOs have greater certainty that the future transmission grid can be operated safely.
机译:网络代码是欧茨-e起草的一套规则,其中来自能源监管机构合作的指导,促进欧洲电力市场的协调,整合和效率。能源社区的缔约方必须根据来自“第三能源包”的义务,将国家网络代码与欧盟的代码协调一致。网络代码涵盖了欧洲电力传输部门的三个关键领域:网格连接,电网运营和跨境电力市场。有三个连接网络代码需要在国家网格码中实现:生成器的要求,需求连接码和高压直流系统网格连接的要求的网络代码。关于生成器的要求的网络代码列出了新生成器必须遵守的规则,以便连接到传输系统。该代码提供了在将实现的方式上的指导,并在必须选择值的范围内设置范围。选择的值将在国家实施过程中讨论。通过创建一个明确的Pan欧洲能力框架,发电机将提供TSOS的能力更加确定,可以安全运行未来的传输网格。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号