首页> 外文会议>International Conference on Measuring Technology and Mechatronics Automation >An Analysis on risk factors of high risk operations in hydroelectric project
【24h】

An Analysis on risk factors of high risk operations in hydroelectric project

机译:水电项目高风险运营风险因素分析

获取原文

摘要

In the process of the enterprise's production, safety is the key concerned matter. Hydroelectric project construction is the industry with frequent accidents; these accidents have great influences to the society, so the effective measures are taken to prevent accidents and thus change the management style from "post processing" to "predictive control". The accidents data of objects striking of Xiluodu projects in the year of 2004 to 2006 are analyzed, all the factors causing the accidents are determined, and the factors are analyzed qualitatively and quantitatively analyzes with Bayesian network method, finally the safety management program is determined to guide the safety operations. The bad condition of geological environment has the greatest posterior probability; therefore, it is a sensitive factor that might cause the objects striking accidents. More attention should be paid to the geological environment when preventing accidents.
机译:在企业生产的过程中,安全是关键问题。 水电项目建设是行业频繁的事故; 这些事故对社会产生了很大影响,因此有效措施是为了防止事故,从而将管理风格从“后处理”转变为“预测控制”。 分析了2004年至2006年Xiluodu项目的物体意外数据,所有导致事故的因素都是确定的,并且分析了与贝叶斯网络方法定量分析的因素,最后确定安全管理计划 指导安全操作。 地质环境的坏条件具有最大的后验概率; 因此,它是一个可能导致物体引起的事故的敏感因素。 在防止事故时,应更多地关注地质环境。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号