首页> 外文会议>Spacecraft structures conference;AIAA SciTech forum >Simulation of Non-Synchronous Deployment of the Large Deployable Hoop Truss Antenna
【24h】

Simulation of Non-Synchronous Deployment of the Large Deployable Hoop Truss Antenna

机译:大型可展开箍桁架天线非同步展开的仿真

获取原文

摘要

Large deployable antennas are used to improve the antenna gain with the development of mobile satellite communication. Large deployable hoop truss antenna (LDHTA) are widely used for its light-weight, high-precision, small launch volume, and high deployment reliability. Its dynamic modeling and analysis are essential in order to improve the mechanical design and the deployment scheme design of the antenna. In this paper, the flexible multibody dynamics model of a LDHTA is developed via the absolute nodal coordinate formulation (ANCF), which results in constant mass matrix without the centrifugal and Coriolis forces. Then the model is applied for the simulation of the non-synchronous deployment phenomena of the LDHTA considering the flexibility of the structure and decay of the driving force. The angular variance is used to evaluate the non-synchronous phenomena. Results show that the non-synchronous deployment can obviously increase the stress of the hoop struts of LDHTA.
机译:随着移动卫星通信的发展,大型可部署天线被用于提高天线增益。大型可部署环形桁架天线(LDHTA)具有重量轻,精度高,发射体积小和部署可靠性高等优点。它的动态建模和分析对于改善天线的机械设计和部署方案设计至关重要。在本文中,LDHTA的柔性多体动力学模型是通过绝对节点坐标公式(ANCF)建立的,该模型可以在没有离心力和科里奥利力的情况下获得质量恒定的矩阵。然后考虑结构的灵活性和驱动力的衰减,将该模型用于LDHTA的非同步部署现象的仿真。角度方差用于评估非同步现象。结果表明,非同步部署可以明显增加LDHTA的箍筋压力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号