首页> 外文会议>International Conference on Information Technology, Computer and Electrical Engineering >Comparison of cost estimation methods in power wheeling for Java-Bali interconnection system
【24h】

Comparison of cost estimation methods in power wheeling for Java-Bali interconnection system

机译:Java-Bali互连系统电源转动成本估算方法的比较

获取原文

摘要

The method of estimating transmission costs can be divided into two groups i.e. methods that do not require the calculation of power flow or Network-Based Methods and methods based on the calculation of power flow. The first methods include Postage Stamp Method and Contract Path Method. And the second are MW-Mile Method, MVA-Mile Method, Current Base Method etc in this paper three methods (MW-Mile Method, MVA-Mile Method, Current Base Method) are applied for calculating the allocation cost of transmission in Java Bali interconnection system.
机译:估计传输成本的方法可以分为两组,即不需要计算基于电力流或基于网络的方法的方法和方法。第一种方法包括邮票方法和合同路径方法。第二种是MW-Mile方法,MVA-Mile方法,当前基础方法等本文三种方法(MW-Mile方法,MVA-Mile方法,当前基础方法)用于计算Java Bali中传输的分配成本互连系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号