首页> 外文会议>Transportation Research Board Annual meeting >IMPROVING NETWORK CONDITION WITH PREVENTIVE MAINTENANCE- A PAVEMENT MANAGEMENT SYSTEM CASE STUDY IN CHRISTIANSBURG, VA
【24h】

IMPROVING NETWORK CONDITION WITH PREVENTIVE MAINTENANCE- A PAVEMENT MANAGEMENT SYSTEM CASE STUDY IN CHRISTIANSBURG, VA

机译:通过预防性维护改善网络条件-弗吉尼亚州克里斯蒂安堡的路面管理系统案例研究

获取原文

摘要

This paper discusses the development of a pavement management system (PMS) for the Town ofChristiansburg VA, and the use of pavement management applications to demonstrate theeffectiveness of implementing preventive maintenance on their street network. Students atVirginia Tech worked with personnel from the Town of Christiansburg to gather inventory dataand past work history on all of the pavements within the town's network. First, the network wasdeveloped by importing existing GIS data into commercially available PMS software. Theexpected pavement performance was then modeled using age data along with conditioninformation gathered during a survey of the network. The condition data, age data andperformance data were all combined to develop several maintenance and rehabilitation scenariosfor the pavement network. The effect of different budget scenarios on the weighted averagecondition of the network over a 20 year analysis period was determined both when preventivemaintenance was incorporated and when only major rehabilitation (e.g. overlays) was conducted.The results indicated that implementing a PMS in the Town of Christiansburg can greatlysupport the town engineers in determining the optimal work types and work scenarios for long16term budgeting and planning. Furthermore, it was found that implementing a preventivemaintenance strategy into the work conducted on the network has the potential to significantlyreduce the cost of maintaining the network at a high condition rating.
机译:本文讨论了城镇管理的路面管理系统(PMS)的开发。 弗吉尼亚州克里斯琴斯堡(Christiansburg VA)以及使用路面管理应用程序来演示 在其街道网络上实施预防性维护的有效性。的学生 弗吉尼亚理工大学与克里斯琴斯堡镇的人员一起收集库存数据 以及该镇网络中所有人行道的过去工作历史。首先,网络是 通过将现有GIS数据导入市售PMS软件进行开发。这 然后使用年龄数据和状况对预期的路面性能进行建模 在网络调查期间收集的信息。条件数据,年龄数据和 绩效数据全部组合在一起,制定了几种维护和修复方案 用于人行道网络。不同预算方案对加权平均值的影响 在预防性的情况下,确定了20年分析期内网络的状况 进行了维护,并且仅进行了大面积的修复(例如覆盖)。 结果表明,在克里斯琴斯堡镇实施PMS可以大大 支持城镇工程师确定长期的最佳工作类型和工作方案16 定期预算和计划。此外,还发现实施预防措施 将维护策略纳入在网络上进行的工作有可能显着地 降低将网络维持在较高状态等级的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号