首页> 外文会议>Oil shale symposium >Status Update of Enefit280 Shale Oil Production Plant in Estonia
【24h】

Status Update of Enefit280 Shale Oil Production Plant in Estonia

机译:爱沙尼亚Enefit280页岩油生产厂的状态更新

获取原文

摘要

1. Enefit280 retorting process is operative using CFB based solid heat carrier process 2. Enefit280 commissioning is progressing slowly but surely 3. Enefit280 has reached 85% of design capacity 4. Still to go 4.1 Increasing Enefit280 capacity to 280t/h 4.2 Reach a more steady operation of the process over longer periods 4.3 Commissioning of the steam turbine and start power production 4.4 According to current plan, the Enefit280 oil plant should reach full capacity in 2014.
机译:1. Enefit280蒸煮过程可使用基于CFB的固体载热体工艺进行操作2. Enefit280调试缓慢但可靠地进行3. Enefit280已达到设计产能的85%4.仍需进行4.1将Enefit280产能提高至280t / h 4.2达到更高该过程可长期稳定运行4.3汽轮机调试并开始发电4.4根据当前计划,Enefit280油厂应在2014年达到满负荷生产。

著录项

  • 来源
    《Oil shale symposium》|2013年|584-591|共8页
  • 会议地点
  • 作者

    Indrek Aarna;

  • 作者单位
  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号