首页> 外文会议>Chinese Control Conference >Coordination Method of Pencil Lead Sinter Production Line System Based on MAS
【24h】

Coordination Method of Pencil Lead Sinter Production Line System Based on MAS

机译:基于MAS的铅笔引线烧结烧结生产线系统的协调方法

获取原文
获取外文期刊封面目录资料

摘要

In this paper, the coordination method of the automatic reform for a pencil lead sinter production line is studied. For the complex task characteristics of the production line, we design the pencil lead sinter production line system with a variety structures of robots based on the theory of MAS(Multi-Agent-System), including robotic structures of gantry robot, rotating robot, cantilever robots. According to the characteristics of the system, we focus on coordination methods and scheduling of the entire system. Aiming at the defect of traditional contract net, the parameters of credibility and friendly degrees are adopted, and the task contractor attribute parameters are put forward to improve the contract net model. The improved contract net method is used to coordinate and schedule the entire system. After simulation and practical experiments, this method is verified to be able to make the system complete the entire production process efficiently and stably. Hence, the workers are freed from the harsh working environments and the cost of production is greatly reduced.
机译:本文研究了铅笔引线烧结生产线自动改革的协调方法。对于生产线的复杂任务特性,我们设计了基于MAS(多助理系统)理论的机器人的铅笔引线烧结生产线系统,包括龙门机器人,旋转机器人,悬臂机的机器人结构机器人。根据系统的特点,我们专注于整个系统的协调方法和调度。针对传统合同网的缺陷,采用了可信度和友好度的参数,并提出了任务承包商属性参数来改进合同净模型。改进的合同网方法用于协调和安排整个系统。在仿真和实验实验之后,验证了这种方法能够使系统能够有效且稳定地完成整个生产过程。因此,工人从恶劣的工作环境中释放,生产成本大大减少了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号