AN APPLICATION OF THE SSHAC LEVEL 3 PROCESS TO THE PROBABILISTIC SEISMIC HAZARD ANALYSIS FOR NUCLEAR FACILITIES AT THE HANFORD SITE, EASTERN WASHINGTON, USA

机译:SSHAC 3级过程在美国华盛顿州汉福德基地核设施的概率地震危险性分析中的应用

获取原文

摘要

Under the sponsorship of the US Department of Energy (DOE) and the electric utility Energy Northwest (owner of Columbia Generating Station, CGS), the Pacific Northwest National Laboratory (PNNL) is conducting a PSHA within the framework of a SSHAC Level 3 procedure. Specifically, the project is being conducted following the guidelines and requirements specified in NUREG-2117 (USNRC, 2012b) and the American Nuclear Standard ANSI/ANS-2.29-2008 Probabilistic Seismic Hazard Analysis. The collaboration is spawned by the needs of both organizations for an accepted PSHA with high levels of regulatory assurance that can be used for the design and safety evaluation of nuclear facilities. DOE committed to this study after performing a ten-year review of the existing PSHA, as required by DOE Order 420.1C. The study will also be used by Energy Northwest as a basis for fulfilling the NRC's 10CFR50.54(f) requirement that the western US nuclear power plants conduct PSHAs in conformance with SSHAC Level 3 procedures. The study was planned and is being carried out in conjunction with a project Work Plan, which identifies the purpose of the study, the roles and responsibilities of all participants, tasks and their associated schedules, Quality Assurance (QA) requirements, and project deliverables. New data collection and analysis activities are being conducted as a means of reducing the uncertainties in key inputs to the PSHA. It is anticipated that the results of the study will provide inputs to the site response analyses at multiple nuclear facility sites within the Hanford Site and at CGS.
机译:在美国能源部(DOE)和电力公用事业西北能源公司(CGS哥伦比亚所有者)的赞助下,太平洋西北国家实验室(PNNL)在SSHAC 3级程序框架内进行了PSHA。具体来说,该项目是按照NUREG-2117(USNRC,2012b)和美国核标准ANSI / ANS-2.29-2008概率地震危险分析中指定的准则和要求进行的。两家组织对公认的PSHA的需求催生了这种合作,PSHA具有高水平的监管保证,可用于核设施的设计和安全评估。美国能源部按照美国能源部第420.1C号命令的要求,对现有的PSHA进行了十年的审查后,致力于这项研究。该研究还将被西北能源公司用作满足NRC的10CFR50.54(f)要求的基础,该要求是美国西部核电厂按照SSHAC 3级程序进行PSHA。该研究已计划并正在与项目工作计划一起进行,该工作计划确定了研究的目的,所有参与者的角色和职责,任务及其相关的时间表,质量保证(QA)要求和项目可交付成果。正在开展新的数据收集和分析活动,以减少对PSHA的关键输入的不确定性。预计该研究的结果将为汉福德厂址和CGS的多个核设施厂址的厂址响应分析提供输入。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号