RECENT DEVELOPMENTS IN SEDIMENT MANAGEMENT IN THE PORT OF HAMBURG

机译:汉堡港区沉积物管理的最新发展

获取原文

摘要

The Port of Hamburg is situated at the upper end of the Elbe estuary, 100 km from the North Sea and at the lower reaches of one of Europe's large rivers with a length of 1100 km. Environmental and economic challenges concerning dredging in the Elbe Estuary arise from a complicated suite of anthropogenic influences. In the late 1970's contamination of Elbe sediments was detected which led to treatment and safe disposal of dredged material on land. The closedown of whole industries in former Eastern Europe and the implementation of treatment plants resulted in a decreasing contamination of sediments in the 1990's which facilitated the relocation of dredged material for the port. Today due to upstream secondary sources sediment contamination in the Elbe estuary still exceeds lower guidance values of Germany's dredged material regulation, hence contamination remains a key issue. Maintenance dredging of the Tidal Elbe for navigation amounts to about 15-20 Mio. m~3 of sediments per year, of which 4 to 5 Mio. m~3 are dredged in the Port area alone. In June 2008 the German Federal Waterways Administration with the Hamburg Port Authority published a River Engineering and Sediment Management Concept for the Tidal Elbe including an overall package of measures. The primary source of motivation was the increase in energy input in the delta with disturbed material balance, the rise in the quantity of sediment to be dredged for the maintenance of the water depth, particularly in the Hamburg area and an altered legal framework, most notably the EU Birds and Habitats Directives, the Water Framework Directive and the Marine Strategy Directive. While those regulations together build a very strict, closed meshed network they also can offer opportunities for action. The paper will report on recent developments and activities concerning sediment management in the Port of Hamburg.
机译:汉堡港位于易乐河口的上端,距离北海有100公里,距离欧洲大河中的距离有1100公里。关于易北河疏浚疏浚的环境和经济挑战从一种复杂的人为影响套件中产生。在20世纪70年代后期,检测到易肢体沉积物的污染,导致疏浚物料处理和安全处置。前东欧的整个行业和治疗厂的实施导致了1990年的沉积物的污染促进了港口疏浚物料的迁移。如今,由于上游的二级资源沉积物污染南部灾害仍然超过德国疏浚物品监管的较低指导价值,因此污染仍然是一个关键问题。潮汐挖掘的导航量为约15-20 mio.每年沉积物的m〜3,其中4至5 mio. M〜3在港口区疏浚。 2008年6月,汉堡港务局的德国联邦水道管理局发表了一条潮汐史采夫的河流工程和沉积物管理理念,包括整体措施。主要动机源是δ在具有干扰物平衡的δ中的能量输入的增加,沉积物量的增加,用于维持水深,特别是在汉堡地区和改变的法律框架中,最值得注意的是欧盟鸟类和栖息地指令,水框架指令和海洋战略指令。虽然这些法规在一起建立了一个非常严格的,但它们也可以为行动提供机会。本文将报告汉堡港区沉积物管理的最新发展和活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号