首页> 外文会议>Iranian Conference on Electrical Engineering >Smart Distribution Network Reconfiguration Based on Optimal Planning of Distributed Generation Resources Using Teaching Learning Based Algorithm to Reduce Generation Costs, Losses and Improve Reliability
【24h】

Smart Distribution Network Reconfiguration Based on Optimal Planning of Distributed Generation Resources Using Teaching Learning Based Algorithm to Reduce Generation Costs, Losses and Improve Reliability

机译:智能配送网络重新配置了基于教学学习算法的分布式生成资源的最优规划,降低了生成成本,损失和提高可靠性

获取原文
获取外文期刊封面目录资料

摘要

Over the past years, the goals of planning power systems have changed. Use of high-efficiency resources, loss reduction, environmental issues, projects' costs, etc. are among these goals. There are various ways in the power system to improve the conditions that can be referred to as the reconfiguration of distribution feeders, minimizing actual losses and improving reliability. On the other hand, in order to achieve the stated goals, distributed generation sources enter distribution networks, which are mostly radial, with a high penetration ratio. The presence of these resources causes problems in distribution networks. Therefore, reconfiguration operation comes with difficulty due to the network complication. Moving networks towards smart ones makes the data available at any moment and eliminates uncertainties. So, there is the possibility of reconfiguration in the smart space instantly. This paper has focused on network reconfiguration and simultaneous planning of generation rate of distributed generation sources per hour, considering the 24-hour load profile in order to minimize the costs of network losses and energy not supplied. Also, given the fact that distributed generation sources are used for costs minimization, network owners must pay for distributed generation sources. Therefore, this cost is also considered in 24 hours for the proposed target function. To do this, the optimal location of distributed generation source is identified and then reconfiguration and generation planning are done in 24-hours. Simulations are performed on the standard IEEE 69-bus distribution network that confirms the effectiveness of the proposed method.
机译:在过去几年中,规划电力系统的目标发生了变化。使用高效资源,损失减少,环境问题,项目的成本等。电力系统中有各种方法可以改善可称为分配馈送器的重新配置的条件,最大限度地减少实际损耗并提高可靠性。另一方面,为了实现所述目标,分布式的发电源进入分配网络,主要是径向的,具有高穿透比。这些资源的存在会导致分销网络中的问题。因此,由于网络并发症,重新配置运算难以困难。向智能网络移动网络使得任何时刻可用的数据并消除不确定性。因此,存在即时在智能空间中重新配置。本文专注于网络重新配置和同时规划每小时的分布式发电源的生成率,考虑到24小时负载概况,以最大限度地降低未提供的网络损耗和能量的成本。此外,鉴于分布式生成源用于成本最小化的事实,网络所有者必须支付分布式生成源。因此,该成本也在24小时内考虑了所提出的目标功能。为此,识别分布式发电源的最佳位置,然后在24小时内进行重新配置和生成规划。在标准IEEE 69总线分配网络上执行模拟,该网络确认了所提出的方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号