首页> 外文会议>Triannual international conference on ports >DESIGN AND CONSTRUCTION OF BERTH IV MARGINAL WHARF AT SEAGIRT MARINE TERMINAL
【24h】

DESIGN AND CONSTRUCTION OF BERTH IV MARGINAL WHARF AT SEAGIRT MARINE TERMINAL

机译:海洋码头总站BERTH IV码头的设计与建造

获取原文
获取外文期刊封面目录资料

摘要

The Seagirt Marine Terminal (SMT) area was originally constructed in 1980 to serve as the placement site for the material excavated to construct the I-95 Ft. McHenry Tunnel under Baltimore harbor. Cellular steel cofferdams were constructed to serve as the seaside retention structure. Over the past 30 years, the Maryland Port Administration (MPA) has been developing SMT as its premier container handling facility. Berths 1, 2, and 3 were constructed in the late 1980's to serve Panamax class vessels. Realizing the critical importance of providing a berth capable of handling 'New Panamax' class ships with 50 ft. (15.2 m) dredge depth, MPA entered into a public-private partnership with Ports America Chesapeake (PAC) to develop such a facility. In turn, PAC initiated a rapidly paced design-build venture to design and construct the berth. The new Berth IV is 1225 ft. (373 m) long and 154 ft. (47 m) wide with a 262-ft. (80-m) long sheetpile toewall on the Berth 3 end, and outboard mooring dolphin on the other end. Four state-of-the art 100-ft. (31-m) gage Supermax container cranes now traverse the new wharf structure. Significant design challenges were imposed by very poor soil conditions, cofferdam cell displacements, and heavy design load demand from ship docking and the Supermax cranes. The resulting wharf structure design featured ballasted precast slab panels founded on 24-in. (61-cm) square prestressed piles. The two crane rails are supported by cast-in-place concrete girders founded on 30-in. (76-cm) square prestressed piles. From the environmental perspective, the construction of the wharf required removal of some existing stormwater management controls that served a portion of the container yard. This necessitated the design of a 190-ft. (58-m) long by 29-ft. (9-m) wide underground stormwater vault.
机译:Seagirt航站楼(SMT)区域最初建于1980年,用作放置I-95 Ft的挖掘材料的放置场所。在巴尔的摩港口下的麦克亨利隧道。建造了蜂窝状的钢围堰以用作海边保留结构。在过去的30年中,马里兰州港口管理局(MPA)一直在将SMT开发为其主要的集装箱装卸设施。 1号,2号和3号泊位是在1980年代后期建造的,用于为巴拿马型船服务。意识到提供能够处理50英尺(15.2 m)疏edge深度的“新巴拿马型”船的泊位至关重要,MPA与美国切萨皮克港(PAC)建立了公私合作伙伴关系,以开发这种设施。反过来,PAC发起了一项节奏迅速的设计建造项目,以设计和建造泊位。新型Berth IV的长1225英尺(373 m),宽154英尺(47 m),长262英尺。泊位3端的长80米长的板桩脚趾墙,另一端是舷外系泊海豚。四个最先进的100英尺。 (31米)规格的Supermax集装箱起重机现在横穿了新的码头结构。严重的土壤条件,围堰单元的位移以及船坞和Supermax起重机的沉重设计载荷要求带来了重大的设计挑战。最终的码头结构设计采用了24英寸厚的压载预制板。 (61厘米)方形预应力桩。两条起重机导轨由30英寸的现浇混凝土大梁支撑。 (76厘米)方形预应力桩。从环境的角度来看,码头的建设需要拆除一些现有的雨水管理控制措施,这些控制措施服务于集装箱堆场的一部分。这就需要设计一个190英尺的高度。 (58米)长29英尺。 (9米)宽的地下雨水库。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号