首页> 外文会议>Conference on the industrial and commercial use of energy >The value of simulation models when implementing mine DSM projects
【24h】

The value of simulation models when implementing mine DSM projects

机译:实现矿井DSM项目仿真模型的价值

获取原文

摘要

Mine Demand Side Management (DSM) projects are becoming increasingly expensive. In addition, some mining groups are cash-strapped due to reduced commodity prices and higher-than-inflation cost increases. This means that client funding for DSM projects is limited. Even with Eskom-IDM's financial contributions, DSM-projects must generate adequate and sustainable savings to ensure acceptable payback of client project capital. Unfortunately, savings from DSM projects are sometimes tough to predict. This makes it increasingly difficult to motivate client capital expenditure on these projects. One solution to predict expected results is to use simulation. In this paper, the value of simulations is demonstrated with projects on mine compressed air systems. It is shown that simplified simulations can be used to quickly determine electricity cost savings potential and the financial feasibility of proposed projects.
机译:矿井需求侧管理(DSM)项目越来越昂贵。此外,一些采矿团体由于商品价格降低和高于通货膨胀成本增加而导致现金绑定。这意味着DSM项目的客户资金有限。即使与Eskom-IDM的财务贡献,DSM-Projects也必须产生充足和可持续的储蓄,以确保客户投资资本的可接受投资回报。不幸的是,邓斯曼项目的节省有时很难预测。这使得激励这些项目的客户资本支出越来越困难。预测预期结果的一个解决方案是使用模拟。在本文中,用矿山压缩空气系统的项目对模拟的价值进行了说明。结果表明,简化的模拟可用于快速确定电力成本节约潜力和建议项目的财务可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号