首页> 外文会议>International Conference on the European Energy Market >Lessons from the first capacity market auction in Great Britain
【24h】

Lessons from the first capacity market auction in Great Britain

机译:来自英国第一产能市场拍卖的课程

获取原文
获取外文期刊封面目录资料

摘要

The first capacity market auction covering Great Britain's electricity sector took place in December 2014, and resulted in 49.3 GW securing capacity contracts for delivery in 2018/2019 at a clearing price below most market expectations. The results have generally been hailed a success by policymakers, but the auction design is still likely to evolve as the results of the first auction are assessed against the policy objectives. With 2.6 GW of new capacity securing 15-year contracts and 6 GW of existing capacity exiting the auction, an area of particular interest may be the contract lengths available for different types of participants. At a time when Capacity Remuneration Mechanisms are being considered across Europe, the design and outcomes of Great Britain's capacity market are being analysed with great interest and can provide important lessons to policymakers across Europe.
机译:覆盖大不列颠电力部门的第一届产能市场拍卖于2014年12月举行,导致49.3 GW在2018/2019年的交付能力合同,以低于大多数市场预期的价格。结果一般被政策制定者获得了成功,但拍卖设计仍然可能发展,因为在初步拍卖的结果是针对政策目标的评估。凭借2.6 GW的新能力确保了15年合同和6 GW的现有产能退出拍卖,一个特别兴趣的区域可能是可用于不同类型参与者的合同长度。在欧洲考虑能力薪酬机制时,大不列颠高兴能力市场的设计和结果正在极其兴趣,可以为欧洲各地的政策制定者提供重要的教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号