首页> 外文会议>International Conference on Service Systems and Service Management >A project portfolio selection decision support system
【24h】

A project portfolio selection decision support system

机译:项目组合选择决策支持系统

获取原文

摘要

The selection and scheduling of a portfolio of projects is a task frequently found among the strategical activities performed by management staff in several industries. When choosing a project to be selected and scheduled into a portfolio, managers have to deal with conflicting criteria, resource constraints, distinct scenarios, and changes during the planning and execution phases. In this work, we describe the functionalities of a decision support system (DSS) prototype designed to help managers make better decisions, when constructing a portfolio of projects. The DSS software was developed to solve portfolio selection problems originating at a large corporation in the power generation industry. It implements a heuristic algorithm, which finds solutions at least 10% better than a manually produced solution for a real-world input instance.
机译:项目组合的选择和进度安排是在多个行业的管理人员执行的战略活动中经常发现的一项任务。在选择要选择的项目并将其安排到项目组合中时,管理人员必须在规划和执行阶段应对冲突的标准,资源约束,不同的方案以及变更。在这项工作中,我们描述了决策支持系统(DSS)原型的功能,该原型旨在帮助管理人员在构建项目组合时做出更好的决策。开发DSS软件是为了解决发电行业中一家大型公司的投资组合选择问题。它实现了一种启发式算法,该算法找到的解决方案比实际输入实例的人工解决方案至少好10%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号