首页> 外文会议>International pipeline conference >Challenges of hot tapping into a sour gas transmission line
【24h】

Challenges of hot tapping into a sour gas transmission line

机译:热挖掘成酸性气体传输线的挑战

获取原文

摘要

Chevron Canada Resources recently completed a hot tap on the Simonette high-pressure sour gas transmission line near Grande Prairie, Alberta. The hot tap was required to bring on new production into the Simonette pipeline without shutting in existing production. The hot tap was completed under full line pressure and gas/condenstate flow during the winter with temperatures averaging -20 deg C.
机译:Chevron Canada Resources最近完成了在艾伯塔格兰德大草原附近的Simonette高压酸性气体输送线的热点。热龙头被要求将新生产带入Simonette管道,而不会在现有生产中关闭。在冬季的全线压力和气体/冷凝琴流量下完成热龙头,温度平均-20℃。