首页> 外文会议>IEEE Conference on Industrial Electronics and Applications >A non iterative method based on graph theoretic approach to solve meter placement problem for power system state estimation
【24h】

A non iterative method based on graph theoretic approach to solve meter placement problem for power system state estimation

机译:基于曲线图理论方法解决电表放置问题的非迭代方法,用于电力系统状态估计

获取原文

摘要

A new method based on graph theoretic approach is presented to solve the measurement placement problem for power system state estimation. The proposed method allows measurement placement without iterative additions. The measurement configurations are designed for IEEE 14 and 30 bus systems. Utilizing the proposed measurement system configuration the network observability is tested for P-θ and Q-V models by triangular factorization of the gain matrix. The designed metering scheme assures network observability and accomplishes better accuracy and bad data processing requirements for state estimator. The developed method can be used for measurement systems planning to maintain overall system observable even under branch contingencies and loss of measurements.
机译:提出了一种基于图形理论方法的新方法,解决了电力系统状态估计的测量放置问题。所提出的方法允许在没有迭代的情况下进行测量展示。测量配置是为IEEE 14和30总线系统设计的。利用所提出的测量系统配置,通过增益矩阵的三角形分解,对P-θ和Q-V型模型测试网络可观察性。设计的计量方案确保网络可观察性,并实现了对状态估算器的更好的准确性和数据处理要求。开发的方法可用于测量系统规划,即使在分支偶然和测量损失下也可以保持整体系统可观察到的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号