Geddes Brook/Ninemile Creek: Years 1 and 2 Lessons Learned during Remediation of 1.5 Miles of Stream and 35 Acres of Floodplain

机译:Geddes Brook / Ninemile Creek:在修复1.5英里的溪流和35英亩的洪泛区的过程中学到的第一年和第二年的经验

获取原文

摘要

Background/Objectives. The cleanup of Geddes Brook and Ninemile Creek began in2011 and is anticipated to take 4 years to complete. Ninemile Creek and its tributary,Geddes Brook, are located northwest of the City of Syracuse, New York. GeddesBrook/Ninemile Creek has been impacted by past industrial pollution, relocated andchannelized by road and bridge construction, and populated largely by non-native invasiveplant species. The Geddes Brook/ Ninemile Creek Site includes approximately 1.5miles of channel and 35 acres of wetland/floodplain impacted from industrial pollution.The chemical parameters of interest for the site include mercury, lead, arsenic, totalPCBs, total PAHs, phenol, and hexachrolobenzene. The selected remedy for the site includesapproximately 200,000 cubic yards of soil and sediment removal along withextensive habitat restoration.Approach. During development of the design, a significant focus of the project team wasto identify how habitat restoration objectives could be integrated with the remediationgoals. At the same time, the selected remedy attempted to take advantage of practical approachesthat would be beneficial during implementation of the remedial action andultimately contribute to the long-term success and sustainability of the project. To facilitateeffective removal of the invasive species and allow for a clear removal horizonduring construction, the Geddes Brook design called for removal to the underlying claylayer. In addition, a restoration design was developed which improved sinuosity and increasedlength of the channel, improved connectivity between the channel and itsfloodplain, and provided invasive species control measures by using onsite clay materialsto shape the restoration subgrade, creating a civil mass balance minimizing disposal andbackfill costs.A portion of Ninemile Creek (approximately 1000 feet) is located immediately adjacentto industrial wastebeds. Due to steep side slopes along the wastebeds, there is littleto no riparian habitat zone in this area. The remedial action will re-locate the channel furtheraway from the wastebeds to facilitate a wider more productive riparian habitat zonewhile allowing for deeper removals in the areas of elevated impacts. The channel relocationalso provides other advantages including construction sequencing, habitat enhancement,and a more sinuous channel.
机译:背景/目标。 Geddes Brook和Ninemile Creek的清理工作始于 2011年,预计需要4年才能完成。 Ninemile Creek及其支流, 盖德斯布鲁克(Geddes Brook)位于纽约锡拉库扎(Syracuse)市西北。格德斯 Brook / Ninemile Creek受过去工业污染的影响,搬迁并 通过道路和桥梁建设渠道化,并主要由非本地入侵者组成 植物品种。 Geddes Brook / Ninemile Creek站点包括约1.5个站点 受工业污染影响的航道英里数和35英亩的湿地/洪泛区。 该地点感兴趣的化学参数包括汞,铅,砷,总汞 多氯联苯,多环芳烃,苯酚和六氯苯。该网站选择的补救措施包括 约200,000立方码的土壤和沉积物清除以及 广泛的栖息地恢复。 方法。在设计开发过程中,项目团队的重点是 确定如何将栖息地恢复目标与整治相结合 目标。同时,所选的补救措施试图利用实际方法 在实施补救措施期间将是有益的,并且 最终为项目的长期成功和可持续性做出贡献。为了方便 有效清除入侵物种,并有明确的清除范围 在施工过程中,Geddes Brook设计要求去除底层的粘土 层。此外,还开发了一种修复设计,可改善弯曲度并增加 通道的长度,改善了通道与其通道之间的连通性 洪泛区,并通过使用现场黏土材料提供了入侵物种控制措施 塑造修复路基,创造民用平衡,最大程度地减少处置和 回填费用。 Ninemile Creek的一部分(约1000英尺)紧邻 到工业废料场。由于沿着废物床的陡坡,几乎没有 到这个地区没有河岸栖息地。补救措施将进一步将渠道重新定位 远离废物床,以促进更宽泛的生产力河岸生境区 同时允许在影响较大的区域进行更深层次的清除。通道重定位 还提供其他优势,包括施工顺序,栖息地改善, 和更弯曲的渠道。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号