首页> 外文会议>International IFIP working conference on enterprise interoperability >Toward a Methodology to Control Interoperability Improvement Projects Execution
【24h】

Toward a Methodology to Control Interoperability Improvement Projects Execution

机译:寻求一种控制互操作性改善项目执行的方法论

获取原文

摘要

In front of the increasing complexity of information systems, improving enterprise interoperability has become a crucial element for better management. To address this issue, several research projects have been launched during the last decade and have resulted in a set of frameworks which help organizing and performing enterprise interoperability projects efficiently. In addition to these frameworks, many metrics have been also developed to measure the interoperability degree between systems. However, these frameworks and metrics are not sufficient to better control execution of these projects. Indeed, they don't take into account resource management and unanticipated events or situations that can be encountered during execution. Moreover, there is a real lack in methodologies to deal with this situation. The aim of this paper is to introduce a new approach to control interoperability improvement projects execution by using control theory, project planning theory and a specific quantitative interoperability metric Ratlop.
机译:在信息系统日益复杂的面前,改善企业的互操作性已成为改善管理的关键要素。为了解决此问题,在过去十年中启动了多个研究项目,并形成了一系列框架,这些框架有助于有效组织和执行企业互操作性项目。除了这些框架之外,还开发了许多度量标准来度量系统之间的互操作性。但是,这些框架和指标不足以更好地控制这些项目的执行。实际上,它们没有考虑资源管理以及执行期间可能遇到的意外事件或情况。此外,确实缺乏应对这种情况的方法。本文的目的是通过使用控制理论,项目计划理论和特定的定量互操作性度量Ratlop来介绍一种控制互操作性改进项目执行的新方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号