首页> 外文会议>International Conference on Information Management, Innovation Management and Industrial Engineering >Research on Optimization for Balance of BSP Model Assembly Line Based on Flexsim
【24h】

Research on Optimization for Balance of BSP Model Assembly Line Based on Flexsim

机译:基于Flexsim的BSP模型装配线平衡优化研究

获取原文

摘要

The assembly line exists widely in manufacturing systems. The problems of assembly line balance directly affect the productivity of manufacturing systems. The paper is focused on assembly line for BSP models of a company, balance for which is to be improved through industrial engineering methods. Balance of the assembly line is studied by system simulation technology. By using Simulation - Balance - Simulation method, comparative analysis on the important indicator and station utilization before and after the balance is carried out, so as to achieve balanced processes load, improve assembly line balancing rate, reduce waste and production costs.
机译:在制造系统中,装配线存在广泛。装配线余额的问题直接影响了制造系统的生产率。本文专注于公司BSP模型的装配线,通过工业工程方法将改善平衡。通过系统仿真技术研究了装配线的平衡。通过使用仿真 - 平衡 - 仿真方法,对余额之前和之后的重要指标和站利用的比较分析,以实现平衡处理负荷,提高装配线平衡率,降低浪费和生产成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号