首页> 外文会议>International Conference on Information Management, Innovation Management and Industrial Engineering >The Static Break-even Analysis of Productive Investment Projects Considering the Inventory
【24h】

The Static Break-even Analysis of Productive Investment Projects Considering the Inventory

机译:考虑清单的生产投资项目的静态断裂分析

获取原文

摘要

The traditional break-even analysis, the future cash flows produced after project operational having not considered the supply and demand's influence of the actual consumption market, is based on the basic assumption “balance between production and sales”. But most investment projects have large investment and last a long time, and typically the output is also very large, therefore, it’s difficult to ascertain the future profits and costs, the inventory come out easily in the product market. To get close to the market and really assess the future cash flows of the investment projects. In the balance analysis, the factors of inventory that is created between the consumer market and the investment should be given full consideration. The article points out, it is difficult to reach "balance between production and sales" in the real market, it is to improve the traditional break-even analysis by considering inventory. It can reduce the break-even point and the production load and also can improve the ability of adapting the market and resisting risks.
机译:传统的休息分析,项目业务未经考虑的提供和需求对实际消费市场的影响的未来现金流量,是基于“生产与销售之间的平衡”的基础假设。但大多数投资项目都有很大的投资和持续很长时间,而且通常产出也很大,因此,难以确定未来的利润和成本,库存很容易在产品市场中出现。接近市场,真正评估投资项目的未来现金流量。在平衡分析中,应充分考虑消费市场与投资之间的库存因素。文章指出,很难通过考虑库存来改善传统的休息分析,难以达到“生产和销售之间的平衡”。它可以减少断裂点和生产负荷,也可以提高调整市场和抵抗风险的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号