首页> 外文会议>International conference on materials engineering and automatic control >Strain and Cracks of Tunnel Lining Surveyed by Fiber Bragg Grating Strain Sensors and Ultrasonic Tester
【24h】

Strain and Cracks of Tunnel Lining Surveyed by Fiber Bragg Grating Strain Sensors and Ultrasonic Tester

机译:光纤布拉格光栅应变传感器和超声波测试仪测量隧道衬砌的应变和裂缝

获取原文

摘要

The cracks have emerged on the second lining of right tunnel for three months after tunneling in the Xin Chang Tunnel.The maximum crack depth is 264.0 mm which is explored by a RS-ST01C type ultrasonic tester.A fiber Bragg grating strain sensor is developed for measuring the surface strain of second lining.By converting the deflection of structure into the strain of displacement telescopic gauge,a fiber Bragg grating is mounted on two ends of gauge where suffers the strain,and as a result its Bragg wavelength will be shifted.The strain sensitivity and temperature sensitivity of the grating sensor are separately 0.677× 10-6/and 0.968× 10-5/°C.Gratingsensors are installed on the corresponding linings according to the crack distribution.In anobservation period of 51 days,the measurement results indicate that the lining cracks are derivedfrom the tilted pressure of surrounding rock.After a backfill period of 29 days,the tunnel structuresare gradually tending to be stability in the following operation period of 429 days.
机译:新昌隧道掘进后三个月,右隧道第二衬层出现裂缝,最大裂缝深度为264.0mm,由RS-ST01C型超声波测试仪探测到。测量第二衬里的表面应变。通过将结构的挠度转换为位移伸缩式应变仪的应变,在应变仪的应变仪的两端安装了光纤布拉格光栅,其布拉格波长将发生偏移。光栅传感器的应变敏感度和温度敏感度分别为0.677×10-6 /和0.968×10-5 /°C。根据裂纹分布将光栅传感器安装在相应的衬里上。在51天的观察期内,测量结果表明衬砌裂缝是由围岩的倾斜压力引起的。回填29天后,隧道结构逐渐趋于稳定。 g手术周期为429天。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号