EGYPTIAN EXPERIENCE OF LIVE LINE WASHING SYSTEM FOR 500KV OUTDOOR EQUIPMENT TO IMPROVE AVAILABILITY

机译:500KV室外设备带电清洗系统的埃及经验,以提高可用性

获取原文

摘要

It was a challenge for the Egyptian Electricity Holding Company (EEHC) to meet the continuoushigh growth rate of electricity demand, the peak demand increased from 3306MW to 23470MWduring the period 1980 /2010, and energy generated from 20 TWH to 139 TWH in the sameperiod. To meet this challenge, EEHC continuously adds annual achievements in the form ofconstruction of power plants.One of the big new power plants is the Nubaria power plant which was executed during the period2005 – 2009. The plant includes three combined cycle modules with total capacity of (3x750)MW. The 500KV air insulated switchgear ( AIS ) of the power plant is made up of 9 identicalbays for generator transformers which are interconnected to the 500kV network through twooverhead transmission lines, each is single circuit and to the 220kV network through two identicalthree single phase 500/220 kV auto transformers plus one phase as spare.As the External insulation of the 500, 220kV outdoor substations is exposed to salt- laden air anddesert dust, high salt content accumulates on insulators at times of high humidity and fogconditions, which can cause insulator flashovers, hence an extensive substation insulator washingprogram was necessary. The system is used regularly for washing the insulators of the outdoorequipment under tension by spray jet water nozzles permanently mounted on the switchyardequipment.This paper discusses the problem associated with the washing system of the 500kV outdoorcurrent transformers (CTs) in the above mentioned power plant. Different processes wererecommended as agreed between the manufacturers of the CTs and the live line washing system.
机译:埃及电力控股公司(EEHC)面临持续不断的挑战 电力需求增长率高,高峰需求从3306MW增加到23470MW 在1980年/ 2010年期间,在同一时间从20 TWH到139 TWH产生的能量 时期。为了应对这一挑战,EEHC不断以以下形式增加年度成就: 电厂建设。 最大的新发电厂之一是努巴里亚发电厂。 2005年– 2009年。该工厂包括三个联合循环模块,总容量为(3x750) 兆瓦。发电厂的500KV空气绝缘开关设备(AIS)由9个相同的组成。 发电机变压器的机架,通过两个与500kV网络互连 架空传输线,每条都是单回路,并通过两条相同的线路连接到220kV网络 三台500/220 kV单相自动变压器以及一台备用变压器。 由于500 kV 220 kV室外变电站的外部绝缘层暴露于含盐空气和 沙漠尘土,高湿度和雾气时绝缘子上会积聚高盐分 可能导致绝缘子闪络的条件,因此需要对变电站的绝缘子进行大量清洗 程序是必要的。该系统定期用于清洗室外绝缘子 永久安装在开关柜上的喷水喷嘴在张力下的设备 设备。 本文讨论了与500kV室外清洗系统有关的问题 上述发电厂中的电流互感器(CT)。不同的过程是 根据CT的制造商和带电管线清洗系统之间的建议进行推荐。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号