首页> 外文会议>Annual USSD conference >FLOOD PROTECTION FOR THE HENDERSON BAYOU WATERSHED
【24h】

FLOOD PROTECTION FOR THE HENDERSON BAYOU WATERSHED

机译:HENDERSON BAYOU流水的防洪

获取原文

摘要

The Henderson Bayou Watershed in Ascension Parish, Louisiana, includes the town ofGalvez, Louisiana, and has an area of approximately 14 square miles. The main channelof Henderson Bayou begins near the intersection of Misty Oak Court and N. BurnsideAvenue. It flows southeast until it crosses Henderson Bayou Road. From there, thechannel flows northeast until it eventually discharges into the Amite River.Flood management facilities were recommended in a preceding watershed study toprotect against backwater flooding from the Amite River. That study showed majorflooding within the Henderson Bayou Watershed resulting from backwater from theAmite River.Based on the previously completed watershed hydrology report, and due to the variousflooding sources, the focus was designing a flood protection structure for a 10-year AmiteRiver backwater event. The proposed project includes flood gates to maintain the existinglevel of service within the watershed when the Amite River is under normal conditions.Because backwater events could potentially occur in conjunction with large storm events,the design includes a pump station to reduce the potential for flooding of structureswithin the watershed when all gates are closed.This paper presents the final design and construction of the flood management facilitiesconsisting of a proposed stormwater pump station, flood protection levee, and flood gatestructure upstream of the Amite River confluence. The flood gate system consists of fourbulkhead gates including one for the navigation channel to maintain navigation in thebayou. Also, the project includes a levee system that ties into the west side of the pumpstation/flood gate structure and extends in a westward direction in order to complete thebackwater prevention protection system The system is currently under construction(Figure 1).
机译:路易斯安那州扬升教区的亨德森贝尤流域包括 路易斯安那州加尔维斯市,面积约为14平方英里。主要渠道 亨德森·巴约(Henderson Bayou)的球队开始在Misty Oak Court和N. Burnside的交汇处附近 大街。它向东南流动,直到穿过亨德森巴尤路(Henderson Bayou Road)。从那里开始 河道向东北流动,直到最终排入阿米特河。 在之前的分水岭研究中建议使用洪水管理设施 防止阿米特河回水泛滥。那项研究表明 Henderson Bayou流域内的洪水是由 阿米特河。 基于先前完成的流域水文学报告,以及由于 洪水源,重点是设计一个为期10年的Amite防洪结构 河死水事件。拟议的项目包括防洪闸门,以维持现有的 当阿米特河处于正常条件下时,该分水岭内的服务水平。 由于死水事件可能与大风暴事件一起发生, 该设计包括一个泵站,以减少建筑物被淹的可能性 所有闸门关闭时,在分水岭内。 本文介绍了防洪设施的最终设计和施工 包括拟议的雨水泵站,防洪堤和防洪闸门 结构在阿米特河汇流上游。防洪闸门系统由四个部分组成 舱壁门,其中一个用于导航通道,以在 河口。此外,该项目还包括一个与泵西侧相连的堤防系统。 车站/泄洪闸结构并向西延伸,以完成 回水预防保护系统该系统正在建设中 (图1)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号