CASE STUDY: BLAKELY MOUNTAIN DAM

机译:案例研究:布莱克山山坝

获取原文

摘要

Blakely Mountain Dam, a 1,100 foot long, 205 foot high earthen dam, which forms LakeOuachita, is located approximately 10 miles NW of Hot Springs, AR. This project wasplaced in service in August 1953 and is currently being evaluated for concerns regardingseepage and piping failure modes of the dam.Blakely Mountain Dam was built with a gravel drain abutting against the impervious corefor 3,300 square feet along the length of the dam. This gravel drain does not meet filtercriteria for the impervious core materials and therefore may lead to piping of the corematerial.Construction of a 2 million dollar seepage collection system consisting of an imperviousberm with 10 manholes, ditches, and a V-notch weir was completed in October 2009 tomonitor flow through the dam. Three manholes were equipped with turbidity meters tomonitor soil particles movement through the system.Between November 2010 and January 2011, the collection system had no flow. Thisprompted the Vicksburg district to test for possible leaks throughout the dam, which maycause water and possible piped material to bypass the seepage collection system. InJanuary 2011, a dye test was performed on the dam. This consisted of pumping highlyconcentrated dye into the blanket drain and monitoring for leakage.To date no evidence of piping has been observed. An Issue Evaluation Study (IES) forBlakely commenced this past March. This presentation will profile the dam’s history,results of recent tests, and the outcome of the IES.
机译:布莱克利山水坝,长1100英尺,高205英尺,形成了湖泊 沃希托(Ouachita)位于阿肯色州温泉城西北约10英里处。这个项目是 于1953年8月投入使用,目前正在评估中,有关以下方面的问题 大坝的渗流和管道破坏模式。 布莱克利山水坝的修建是用砾石排水管紧靠不透水的岩心 沿着水坝的长度为3,300平方英尺。该砾石排水口不符合过滤器 防渗芯材料的标准,因此可能导致铁心管道 材料。 建设一个耗资200万美元的防渗系统 2009年10月完成了带有10个人孔,沟渠和V型槽堰的护堤, 监控通过大坝的流量。三个人孔配备了浊度计,以 监控土壤颗粒在系统中的运动。 在2010年11月至2011年1月之间,收款系统没有流程。这 促使维克斯堡(Vicksburg)地区测试整个大坝可能的渗漏,这可能 使水和可能的管道材料绕过渗漏收集系统。在 2011年1月,在大坝上进行了染料测试。这包括高度抽水 浓缩染料进入橡皮布排放口并监控泄漏情况。 迄今为止,尚未观察到管道的迹象。的问题评估研究(IES) 布雷克利于今年三月开始。该演示文稿将介绍大坝的历史, 最近测试的结果,以及IES的结果。

著录项

  • 来源
    《Annual USSD conference》|2012年|607-618|共12页
  • 会议地点
  • 作者

    Ben Emery;

  • 作者单位
  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号