ADDRESSING DEFICIENCIES IN THE VENTURA RIVER LEVEE SYSTEM

机译:解决文图拉河水位系统中的缺陷

获取原文

摘要

Originally constructed in 1949 by the U.S. Army Corps of Engineers, the Ventura River 1Levee System (VR-1) in Ventura County, California was an approximately 2.65-milelonglevee system placed along the bank of the Ventura River. The levee slope wasprotected with loose riprap revetment from the Pacific Ocean to river mile 0.92 then withgrouted riprap revetment to the upstream limit.In an August 31, 2007 letter to the Ventura County Watershed District (District), FEMAidentified potential levees or levee-like situations in Ventura County which FEMA hadreason to believe might provide base-level flood protection to the areas landward of suchlevees. FEMA’s letter provided the District with the opportunity to seek ProvisionallyAccredited Levee (PAL) designation status for some or all of those levees. After a periodof negotiation with FEMA, the list was refined to nine (9) levees, including VR-1 levee,which the District would consider for potential certification pursuant to 44 CFR 65.10.Tetra Tech, on November 25th 2008, was contracted by The District, to perform theanalysis for the PAL certification in order to meet the November 30, 2009 deadline datefor the submission of levee documentation packages to FEMA. In an evaluation reportdated February 20, 2011, Tetra Tech determined that the VR-1 levee could not becertified without rehabilitation of the system. With the PAL timeline expired, FEMA is inthe process of revising their mapping to reflect de-accreditation of this levee.The District is pursuing options with the U.S. Army Corps of Engineers to fully assessthe conditions (existing and future) and rehabilitate the levee. A Feasibility Study or aDesign Deficiency Study is being considered as likely routes to accomplish this work.
机译:最初由美国陆军工程兵部队于1949年建造,文图拉河1 加利福尼亚州文图拉县的堤防系统(VR-1)约2.65英里长 沿着文图拉河河岸的堤防系统。堤防坡度为 用从太平洋到0.9公里河岸的松散护岸护坡进行保护,然后 灌浆的riprap护岸到上游极限​​。 在2007年8月31日给FEMA文图拉县分水岭区(区)的信中 确定了FEMA在文图拉县可能存在的堤防或类似堤防的情况 有理由相信可以为此类地区的陆上地区提供基础级的防洪保护 堤防。 FEMA的信为该地区提供了临时寻求机会的机会。 其中一些或所有堤防的认可堤岸(PAL)指定状态。经过一段时间 经与FEMA协商后,该清单已细化为九(9)个堤防,其中包括VR-1堤防, 根据44 CFR 65.10,学区将考虑对其进行潜在的认证。 利乐科技(Tetra Tech)于2008年11月25日与该地区签约,以履行 分析以进行PAL认证,以便在2009年11月30日截止日期之前完成 向FEMA提交堤防文件包。在评估报告中 日期为2011年2月20日,利乐公司(Tetra Tech)认定VR-1堤坝不能 无需重新安装系统即可获得认证。随着PAL时间线过期,FEMA进入了 修改其映射以反映此堤防取消认证的过程。 该地区正在与美国陆军工程兵团一起寻求方案,以全面评估 条件(现有和将来)并修复堤防。可行性研究或 设计缺陷研究被认为是完成这项工作的可能途径。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号