首页> 外文会议>International conference on nuclear engineering;ASME power conference >ACCIDENT MANAGEMENT ACTIONS IN A LOWER HEAD SBLOCA WITH HPSI FAILED
【24h】

ACCIDENT MANAGEMENT ACTIONS IN A LOWER HEAD SBLOCA WITH HPSI FAILED

机译:HPSI失败的下头SBLOCA中的事故管理动作

获取原文

摘要

In the framework of CAMP and OECD/NEA ROSA projects a broad analysis of Lower Head SBLOCA with High Pressure Safety Injection (HPSI) unavailable in a Westinghouse PWR has been performed. The simulations have been performed with TRACE 5 patch 1 and the selected methodology has been the Integrated Safety Assessment (ISA) methodology, developed by the Spanish Nuclear Safety Council (CSN), which allows obtaining the damage domain as a function of the operator actuation times. The objective of this work is to find the available time for accident management actions by means of ISA methodology. The main conclusions are that present emergency operating procedures are adequate for this kind of sequences and there is not necessary to modify them and also that, the ISA methodology is adequate to analyze safety issues that include time delays uncertainties.
机译:在CAMP和OECD / NEA的框架内,ROSA计划对西屋压水堆中没有的带有高压安全注射(HPSI)的下扬程SBLOCA进行广泛的分析。仿真是使用TRACE 5补丁1进行的,所选的方法是由西班牙核安全委员会(CSN)开发的综合安全评估(ISA)方法,该方法可以根据操作员启动时间获得损坏范围。 。这项工作的目的是通过ISA方法找到可用于事故管理措施的时间。主要结论是,当前的紧急操作程序足以应对此类序列,因此无需对其进行修改,并且ISA方法足以分析包括时间延迟不确定性的安全问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号