首页> 外文会议>World multi-conference on systemics, cybernetics and informatics >Solving an economic production lot size problem incorporating overtime feature
【24h】

Solving an economic production lot size problem incorporating overtime feature

机译:解决加班功能的经济生产批次问题

获取原文

摘要

With the purpose of meeting excessive demand or leveling production schedule, managers often look for overtime option to effectively expedite production process and increase capacity. Motivated by this idea, an economic production lot size (EPLS) problem incorporating overtime feature is explored. A mathematical model is developed to portray the problem, thru formulation and derivation procedure, the expected system cost function is first derived. With a help from differential calculus, we prove that the cost function is convex, and consequently, the most economic production lot size is determined. Numerical demonstration is provided for showing the applicability of the obtained result.
机译:以满足过度需求或调整生产计划的目的,经理经常寻找加班选项,以有效地加快生产过程并提高能力。探讨了这种想法的动机,经济生产批大分比(EPLS)含有加班功能的问题。发展了数学模型来描绘问题,通过配方和推导过程,首先导出预期的系统成本函数。在差分微积分的帮助下,我们证明了成本函数是凸的,因此,最经济的生产批大分比确定。提供了数值演示,用于显示所获得的结果的适用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号