【24h】

DEVELOPMENT OF A SITE HFE PROGRAM

机译:现场HFE程序的开发

获取原文

摘要

Operating nuclear power plants are modernizing their instrumentation and control (I&C) systems. Human-system interfaces (HSIs) in the main control room and at other locations in the plant also will be modernized over time. New maintenance HSIs are also being introduced for use in configuring and maintaining new digital systems. As these changes are made, it is important to ensure that human factors engineering (HFE) aspects are properly considered to ensure adequate human performance, compliance with regulatory requirements, and high levels of safety, reliability and maintainability of the plant. A similar situation will arise for new builds once they are turned over to the utility and modifications are made to the plants over their operating lifetime. Operating plants should have an HFE program in place that ensures proper consideration of HFE as modifications are made. This paper describes the HFE program being developed in a joint EPRI-Luminant project for use at the Comanche Peak nuclear power station. It will initially be applied to the operating units, but it is being developed such that it can be relatively easily adapted for use in new builds as they come on-line. An EPRI report will be prepared to describe the HFE program and the approach used in its development, to facilitate development or improvement of HFE programs at other US nuclear plants.
机译:运营中的核电厂正在对其仪表和控制(I&C)系统进行现代化改造。随着时间的流逝,主控制室和工厂其他位置的人机界面(HSI)也将实现现代化。还引入了新的维护HSI,用于配置和维护新的数字系统。在进行这些更改时,重要的是要确保适当考虑人为因素工程(HFE)方面,以确保适当的人员绩效,符合法规要求以及工厂的高水平安全性,可靠性和可维护性。一旦将新建筑物移交给公用事业并在其使用寿命内对工厂进行了修改,也会出现类似情况。运营工厂应制定HFE计划,以确保在进行修改时适当考虑HFE。本文介绍了在EPRI-Luminant联合项目中开发的HFE计划,该计划将在科曼奇峰核电站使用。它最初将被应用到操作单元,但是正在开发中,以便在新产品上线时可以相对容易地适应于新产品。将准备一份EPRI报告,以描述HFE计划及其开发中使用的方法,以促进美国其他核电厂的HFE计划的开发或改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号