首页> 外文会议>International topical meeting on nuclear plant instrumentation, control, and human-machine interface technologies >NUCLEAR POWER PLANT RISK-INFORMED SURVEILLANCE FREQUENCY CONTROL PROGRAM IMPLEMENTATION AT THE DUKE CATAWBA NUCLEAR PLANT WITH A FOCUS ON INSTRUMENTATION AND CONTROL SYSTEMS
【24h】

NUCLEAR POWER PLANT RISK-INFORMED SURVEILLANCE FREQUENCY CONTROL PROGRAM IMPLEMENTATION AT THE DUKE CATAWBA NUCLEAR PLANT WITH A FOCUS ON INSTRUMENTATION AND CONTROL SYSTEMS

机译:核电站风险通知监控频率控制方案在公爵Catawba核电站的实施,专注于仪表和控制系统

获取原文

摘要

This paper summarizes an updated process for risk-informed surveillance frequency control program (SFCP) implementation at the Catawba Nuclear Power Plant in the past year. This program includes selection and prioritization of specific target surveillance test interval extensions: and development, review, and implementation of surveillance test risk informed documented evaluation (STRIDE) packages designed to support extension of conventional surveillance requirement test intervals, in accordance with "Risk-Informed Technical Specifications Initiative 5b. Risk-Informed Method for Control of Surveillance Frequencies. Industry Guideline." NEI 04-10. Revision 1 [1]. The scope of work associated with STRIDE development includes probabilistic risk assessment (PRA) case studies, deterministic assessment (DA) evaluations, and, where required, instrument drift evaluation (IDE). The STRIDE implementation efforts have also included support of independent decision-making panel (IDP) meetings at the implementing power stations and IDP member training. The purpose of this paper is to provide a presentation of a refined process for STRIDE development with a focus on instrumentation and control systems based on author experience, which includes support for the development of multiple STRIDE packages for the Catawba Nuclear Plant. This paper outlines a framework for practical implementation of an SFCP within the context of an integrated risk-informed performance-based regulation application program with emphasis on instrumentation and control systems.
机译:本文总结了过去一年在Catawba核电站的风险通知监视频率控制计划(SFCP)实施的更新过程。该计划包括特定目标监视测试间隔扩展的选择和优先级:以及监视测试风险的开发,审查和实施知识记录的评估(步幅)旨在支持常规监视要求测试间隔的扩展,根据“风险信息技术规格倡议5B。控制监控频率的风险信息方法。行业指导。“ Nei 04-10。修订1 [1]。与进步发展相关的工作范围包括概率风险评估(PRA)案例研究,确定性评估(DA)评估,以及所需的仪器漂移评估(IDE)。步幅实施努力还包括在执行招牌和IDP成员培训的独立决策小组(IDP)会议上的支持。本文的目的是提供一种提出的进程,以重点关注基于作者体验的仪器控制系统,包括支持CATAWBA核电站的多个进步套餐的开发。本文概述了SFCP的实际实施框架,以便在综合风险的基于绩效的绩效的监管中的监管申请计划中,重点是仪器控制系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号