首页> 外文会议>International topical meeting on nuclear plant instrumentation, control, and human-machine interface technologies >PHYSICAL FIDELITY CONSIDERATIONS FOR NRC ADVANCED REACTOR CONTROL ROOM TRAINING SIMULATORS USED FOR INSPECTOR/EXAMINER TRAINING
【24h】

PHYSICAL FIDELITY CONSIDERATIONS FOR NRC ADVANCED REACTOR CONTROL ROOM TRAINING SIMULATORS USED FOR INSPECTOR/EXAMINER TRAINING

机译:用于检查员/审查员培训的NRC高级电抗器控制室培训模拟器的物理保真考虑

获取原文

摘要

This paper describes research into the physical fidelity requirements of control room simulators to train U.S. Nuclear Regulatory Commission (NRC) staff for their duties as inspectors and license examiners for next-generation nuclear power plants. The control rooms of these power plants are expected to utilize digital instrumentation and controls to a much greater extent than do current plants. The NRC is assessing training facility needs, particularly for control room simulators, which play a central role in NRC training. Simulator fidelity affects both training effectiveness and cost. Research has shown high simulation fidelity sometimes positively affects transfer to the operational environment but sometimes makes no significant difference or actually impedes learning. The conditions in which these different effects occur are often unclear, especially for regulators (as opposed to operators) about whom research is particularly sparse. This project developed an inventory of the tasks and knowledge, skills, and abilities that NRC regulators need to fulfill their job duties. It used expert panels to characterize the inventory items by type and level of cognitive/behavioral capability needed, difficulty to perform, importance to safety, frequency of performance, and the importance of simulator training for learning these capabilities. A survey of current NRC staff provides information about the physical fidelity of the NRC training simulators to the control rooms to which the students were assigned and the effect lack of fidelity had on learning and job performance. The study concludes that a high level of physical fidelity is not required for effective training of NRC staff.
机译:本文介绍了对控制室模拟器的物理保真要求的研究,以培训美国核监管委员会(NRC)工作人员作为下一代核电厂的审查员和许可审查员。这些电厂的控制室预计将在更大程度上利用数字仪器和控制,而不是当前植物。 NRC正在评估培训设施需求,特别是对于控制室模拟器,在NRC培训中起着核心作用。模拟器保真性影响培训效率和成本。研究表明了高模拟保真度有时会对运输环境产生积极影响,但有时不会显着差异或实际阻碍学习。这些不同效果发生的条件往往不清楚,特别是对于监管机构(与运营商而言)的研究特别稀疏。该项目制定了NRC监管机构需要履行其工作职责的任务和知识,技能和能力的清单。它使用专家面板以通过类型和级别的认知/行为能力来表征库存项目,难以执行,对安全性,性能频率的重要性以及模拟器培训来学习这些能力的重要性。对当前的NRC工作人员的调查提供了有关NRC培训模拟器的物理保真与学生被分配的控制室的物理保真的信息,并且对学习和工作表现的影响缺乏忠诚度。该研究得出结论,NRC工作人员有效培训不需要高水平的物理保真度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号