首页> 外文会议>International conference on computer technology and development >MULTI-OBJECTIVE OPTIMIZATION OF POWER PLANT MAINTENANCE PROJECTS BASED ON NSGA-Ⅱ
【24h】

MULTI-OBJECTIVE OPTIMIZATION OF POWER PLANT MAINTENANCE PROJECTS BASED ON NSGA-Ⅱ

机译:基于NSGA-Ⅱ的电厂维修项目多目标优化

获取原文

摘要

Reducing; power plant maintenance costs is an important way to improve the power enterprises production efficiency, for the current situation that maintenance assessment index is too single and the problem of high complexity is difficult to solve by common maintenance optimization methods, power plant multi-objective maintenance projects optimization model is established and solved by a method of fastnon-dominated-sorting genetic algorithm with elitist strategy (NSGA-Ⅱ) in this paper.This method overcomes the previous problem of single optimizing assessment index and improves the efficiency and robustness of the problem solving efficiency.By the case study of a 300MW power unit electric feed pump overhaul, it is proved that the establishment and solvent of this model is effective and feasible.
机译:减少;电厂维修成本是提高电力企业生产效率的重要途径,针对目前维修评估指标过于单一,复杂性高的问题,难以通过通用的维修优化方法来解决的电厂多目标维修项目。本文建立了一种基于精英策略的快速非支配排序遗传算法(NSGA-Ⅱ),建立了优化模型。该方法克服了以往单一优化评估指标的问题,提高了问题求解的效率和鲁棒性。通过对某300MW机组电给水泵大修的案例研究,证明该模型的建立和求解是有效可行的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号