Adhesive Bonding and Sealing of Additional Equipment on Foundations of Large-Scale Offshore Wind-Energy Turbines Withstanding Pile-Driving Operations

机译:耐桩驾驶操作大型海上风能涡轮机基础的辅助粘接及密封

获取原文
获取外文期刊封面目录资料

摘要

Renewable energy is massively on the rise in different parts of the world, and offshore wind-energy farming is now competing for the first time with traditional power stations because of a basic continuity and amount of electrical energy. The relatively new kind of large-scale construction in the sea bed has to withstand the elements for decades, and the certification is based on a number of assumptions; therefore, wishes for changes or additional equipment on the foundations of offshore wind turbines do not comply with certification rules because thermally or mechanical interventions in the structure or the protection coatings might initiate an early damage scenario. Adhesive bonding of additional equipment on foundations is a solution for avoiding such certification problems, but this solution faces two major challenges: withstanding the initial-impact pile driving with huge mechanical accelerations and the more common long-term exposure to sea water, tidal and storm waves, and seasonal temperatures throughout the full lifetime period. Well-performing bonding and sealing over a long period of time presumes the successful survival of the initial high-energy impact pile driving without any damage, and this unique period of just a few hours with several thousand repeating blows can be seen as an enormous encroachment, especially for larger masses bonded to the pile walls. Suitable adhesives and coatings must show a special kind of durability for this initial operation. This paper presents experiences and results from experimental investigations of an adhesive bonding and sealing approach for installing measurement equipment on the vertical walls of different monopile foundations in offshore wind farms in the European North Sea.
机译:可再生能源对世界不同地区的崛起进行了大规模的,海上风能农业现在首次与传统发电站竞争,因为电能的基本连续性和电能量。海面床上相对较新的大规模建设必须经历数十年的元素,认证基于许多假设;因此,对海上风力涡轮机基础的更改或附加设备的愿望不符合认证规则,因为结构或保护涂层中的热或机械干预可能会引发早期损害情景。辅助设备的粘合剂粘合在基础上是一种避免这种认证问题的解决方案,但这种解决方案面临两个主要挑战:承受巨大的机械加速和海水,潮汐和风暴更常见的长期暴露初始冲击桩驾驶在整个寿命期间的波浪和季节性温度。在很长一段时间内良好的粘接和密封假定初始高能量冲击桩驾驶的成功存活,没有任何损坏,这一独特的时期只有几千小时的重复吹拂可以被视为巨大的侵占,特别是对于粘合到桩墙的较大质量。合适的粘合剂和涂料必须为该初始操作显示出特殊的耐用性。本文介绍了在欧洲北海海上风电场不同单披露基础垂直墙上安装测量设备的粘接和密封方法的实验和结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号