首页> 外文会议>International conference on Frontiers of manufacturing science and measuring technology >Research on Calculating Methods of Jacking Force with High Temperature Closure for Continuous Rigid-frame Bridge
【24h】

Research on Calculating Methods of Jacking Force with High Temperature Closure for Continuous Rigid-frame Bridge

机译:连续刚架桥高温闭合计算力计算方法研究

获取原文

摘要

When the continuous rigid frame bridge's actual closure temperature is higher than the design closure temperature,the closure temperature's difference will cause horizontal displacement at top of pier,and cause the structure to have the temperature intennal force.A horizontal jacking force is exerted to eliminate the adverse effect of closure temperature's difference.One calculating method of jacking force is proposed in this paper:Eliminating the horizontal displacement at top of pier method.Taking the Longtan River Bridge as a practice example,the high closure temperature's horizontal jacking force is calculated according to the method separately in this paper.
机译:当连续刚性框架桥的实际闭合温度高于设计闭合温度时,闭合温度的差异将导致码头顶部的水平位移,并导致结构具有温度的洞穴力。施加水平顶升力以消除本文提出了闭环温度差异的不利影响。[本文提出了超顶力的计算方法:消除了码头方法顶部的水平位移。根据实践示例,将龙天河桥的横向桥梁桥接下来,根据本文分别的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号