首页> 外文会议>Power systems computation conference;PSCC 2011 Stockholm >CROSS-ENTROPY METHOD FOR RELIABILITY WORTH ASSESSMENT OF RENEWABLE GENERATING SYSTEMS
【24h】

CROSS-ENTROPY METHOD FOR RELIABILITY WORTH ASSESSMENT OF RENEWABLE GENERATING SYSTEMS

机译:可再生能源系统可靠性评估的交叉熵方法

获取原文

摘要

This work presents a new methodology to evaluate generating capacity reliability indices, with particular emphasis on the Loss of Load Cost. Based on the pseudo-chronological Monte Carlo simulation and the Cross-Entropy method, the main idea is to obtain an optimal distortion for the generation model in order to promote the occurrences of failure events and reduce the variance of the estimators. As a result, the computational efforts of the pseudo-chronological simulation can be greatly reduced while retaining all of its advantages. The proposed method can capture all the actual blocks of un-supplied energy per consumer class and their respective durations to accurately characterize the interruption process. In addition, many chronological aspects such as the fluctuation of generating capacities and scheduling maintenance can be easily included in the simulation model. Comparisons with the chronological and standard pseudo-chronological simulations are reported using several test systems and configurations of real power systems.
机译:这项工作提出了一种评估发电能力可靠性指标的新方法,尤其着重于负荷成本的损失。基于伪时序蒙特卡罗模拟和交叉熵方法,主要思想是为发电模型获得最佳失真,以促进故障事件的发生并减少估计量的方差。结果,可以大大减少伪时序仿真的计算工作量,同时保留其所有优点。所提出的方法可以捕获每个消费者类别的所有未供应能源的实际块及其各自的持续时间,以准确地表征中断过程。另外,许多时间顺序方面,例如发电量的波动和调度维护,都可以轻松地包含在仿真模型中。报告了使用几种测试系统和实际电源系统的配置与按时间顺序和标准伪按时间顺序进行的仿真的比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号