首页> 外文会议>Corrosion conference and expo;Corrosion 2012 >An Integrated Approach to Corrosion Management of Ageing Offshore Assets
【24h】

An Integrated Approach to Corrosion Management of Ageing Offshore Assets

机译:离岸资产老化管理的综合方法

获取原文

摘要

Proactive corrosion management is essential in maintaining the integrity of offshore assets, particularly for systems operating beyond their original design life. The UK Regulator (HSE) has recently put in place an initiative (KP4) which requires duty holders to specifically address the issues of ageing assets and to justify how they will effectively manage the integrity of such assets into the future. Traditionally topsides process plant, subsea pipelines and onshore terminals have been subjected to individual corrosion management schemes, but to meet the requirements of KP4 it is felt that an approach that brings the corrosion management of these individual components into a unified Corrosion Management Scheme (CMS) will prove beneficial. A CMS was developed, in collaboration with a major North Sea operator, over a number of years for a variety of offshore assets that are approaching or exceeding their design life. The CMS is currently supported by a Corrosion Control Strategy (CCS), Topsides Risk Based Inspection (RBI) scheme, Pipeline Corrosion Risk Assessment (CRA) and Pipeline Risk Assessment (PRA) tools. This paper describes the approach that was undertaken by the authors in developing and implementing an integrated corrosion management scheme (CMS) and how this approach is being extended to address the issues raised by the KP4 initiative to ensure the integrity of UK offshore assets beyond their design life.
机译:主动腐蚀管理对于维护海上资产的完整性至关重要,特别是对于超出其原始设计寿命运行的系统而言。英国监管机构(HSE)最近实施了一项倡议(KP4),该倡议要求责任承担者特别解决陈旧资产的问题,并说明他们如何在未来有效管理这些资产的完整性。传统上,上层加工厂,海底管线和陆上码头都经过单独的腐蚀管理计划,但是为了满足KP4的要求,人们认为,可以将这些单独组件的腐蚀管理纳入统一的腐蚀管理计划(CMS)中的方法。将证明是有益的。 CMS与北海一家主要运营商合作开发了许多年,用于接近或超过其设计寿命的各种离岸资产。 CMS目前得到腐蚀控制策略(CCS),基于Topsides基于风险的检查(RBI)计划,管道腐蚀风险评估(CRA)和管道风险评估(PRA)工具的支持。本文介绍了作者在开发和实施综合腐蚀管理计划(CMS)中采用的方法,以及如何扩展该方法以解决KP4计划提出的问题,以确保英国离岸资产的完整性超出其设计范围生活。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号