If I Had This To Do Over..... A Twelve Step Program to Successfully Measure Sewer Rehabilitation

机译:如果我要这样做,那么.....成功测量下水道修复的十二步程序

获取原文

摘要

It has often been said that the best way to learn how to do a thing is to ask experienced people what mistakes they have made and what corrective steps they took in subsequent projects. The goal of this paper is to relay the top twelve issues in the sewer evaluation and rehabilitation process that the authors have identified by asking that question to themselves and others who have experienced both success and failure about their biggest mistakes and greatest triumphs in the measurement of effectiveness of sewer rehabilitation. The sewer rehabilitation 'industry' has a long history of falling short of expected Infiltration Inflow (I/I) reduction. In the mid-1980s, the EPA Construction Grants Program would not award a grant to an applicant predicting that more than 30% of RDII will be removed from a collection system through rehabilitation. This limitation was established in the belief that higher removal rates were not possible. A grant applicant sizing a plant based on 60% RDII removal will end up with an undersized WWTP if only 30% is removed. Many practitioners assume the ineffectiveness lies in the rehabilitation technology used, the extent of rehabilitation or sources of I/I in private sewers that went unaddressed. While the rehabilitation work may contribute to the problem, it is evident to the authors that the approach to measuring I/I removal may contribute as much to the apparent ineffectiveness as the work itself. WERF Project 99-WWF-8 studied I/I removal programs around the US and found that their efforts to acquire detailed analysis were unsuccessful for many utilities because information was not generated and archived suitably or that the data were incomplete or unreliable. The mismatch of methods and procedures for evaluating I/I created a lack of uniformity among agencies performing the sewer rehabilitation. The paper will contain specific recommendations and graphic examples of successful and unsuccessful practices for the measurement of RDII effectiveness. This paper is intended to be useful to both the first-time and experienced I/I project managers who are establishing capital improvement programs for sewer rehabilitation and want to be able to answer the future question - "What have you accomplished with the money?"
机译:经常有人说,学习如何做某事的最佳方法是询问有经验的人他们犯了什么错误以及在后续项目中采取了哪些纠正措施。本文的目的是通过向他们自己和其他经历过成功和失败的人询问他们在测量污水中的最大的错误和最大的成就来提出这个问题,来传达作者已确定的下水道评价和修复过程中的前12个问题。下水道修复的有效性。下水道修复“行业”长期以来未达到预期的入渗量(I / I)减少的目标。在1980年代中期,美国环保署建筑赠款计划不会向申请者提供赠款,因为他们预计将有30%以上的RDII将通过回收从收集系统中移除。建立这种限制是因为相信不可能有更高的去除率。如果仅去除30%的RDII,则赠款申请者将工厂的大小定为60%,最终将产生较小的污水处理厂。许多从业者认为无效之处在于所使用的修复技术,修复程度或未解决的私人下水道I / I来源。尽管修复工作可能会导致此问题,但对于作者来说,很明显,测量I / I删除量的方法可能会导致与工作本身一样明显的无效性。 WERF项目99-WWF-8研究了美国各地的I / I清除程序,发现他们对许多公用事业进行详细分析的努力没有成功,因为没有适当地生成和存储信息,或者数据不完整或不可靠。评估I / I的方法和程序不匹配,导致进行下水道修复的机构之间缺乏统一性。本文将包含针对测量RDII有效性的成功和不成功实践的具体建议和图形示例。本白皮书旨在为正在建立下水道修复的资本改进计划并希望能够回答未来问题的“ I / I项目经理”和“ I / I项目经理”提供有用的信息。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号