MRP-227 REACTOR VESSEL INTERNALS INSPECTION PLANNING AND INITIAL RESULTS AT THE OCONEE NUCLEAR STATION UNIT 3

机译:MRP-227欧盟核站单元3的MRP-227反应堆内部检查计划和初始结果

获取原文

摘要

The U.S. PWR industry has proactively developed generic inspection requirements and standards for reactor vessel (RV) internals. The Electric Power Research Institute (EPRI) Pressurized Water Reactor (PWR) Materials Reliability Program (MRP) has issued MRP-227-A and MRP-228 with mandatory and needed requirements based on the Nuclear Energy Institute (NEI) document NEI 03-08. In addition, the U.S. Nuclear Regulatory Commission (NRC) has issued a Safety Evaluation Report (SER) containing additional requirements for licensees planning to implement the guidelines developed in the MRP-227-A report. Initial examinations performed at the Oconee Nuclear Station Unit 1 (ONS-1) in the fall of 2012 and at Oconee Nuclear Station Unit 2 (ONS-2) in the fall of 2013, which were the first two Babcock & Wilcox (B&W) units to perform an exam of the RV internals using the MRP-227 guidelines, identified several minor degradation issues. In April 2014, ONS Unit 3 (ONS-3) shut down for refueling and completion of the MRP-227 inspection of the RV internals. This paper will discuss the decision planning efforts required for implementing the MRP-227-A and MRP-228 requirements and the results of these initial inspections, with emphasis on the most recent ONS-3 results.
机译:美国PWR行业主动开发了反应堆船舶(RV)内部的通用检验要求和标准。电力研究所(EPRI)加压水反应堆(PWR)材料可靠性计划(MRP)发布了MRP-227-A和MRP-228,并根据核能研究所(NEI)文件NEI 03-08的强制性和所需的要求。此外,美国核监管委员会(NRC)已发出安全评估报告(SER),该报告(SER)载有持牌人计划实施MRP-227-A报告中制定的准则的额外要求。 2012年秋季的OCONEE核站单元1(ONS-1)和2013年秋季的OCONEE核站单元2(ONS-2)进行的初步考试,这是前两种Babcock&Wilcox(B&W)单位要使用MRP-227指南执行RV内部人的考试,确定了几个小的退化问题。 2014年4月,ONS单元3(ONS-3)关闭了加油和完成RV内幕的MRP-227检查。本文将讨论执行MRP-227-A和MRP-228要求和这些初始检查结果所需的决策规划努力,重点是最新的ONS-3结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号