首页> 外文会议>International conference on environmental degradation of materials in nuclear power systems-water reactors >EVALUATION AND IMPLEMENTATION OF METHODOLOGY FOR DISPOSITIONING FLAWS IN Zr-2.5 Nb PRESSURE TUBES OF CANDU~? POWER REACTORS
【24h】

EVALUATION AND IMPLEMENTATION OF METHODOLOGY FOR DISPOSITIONING FLAWS IN Zr-2.5 Nb PRESSURE TUBES OF CANDU~? POWER REACTORS

机译:Zr-2.5%Nb压力管中的前置缺陷方法的评价与实施蜡烛〜?电力反应堆

获取原文

摘要

Adequate assessment of detected flaws is a critical step in demonstrating the fitness for service of the affected components and thereby assuring safe operation of nuclear power plants. Methodologies for the assessment and disposition, for some key structures, systems and components, could significantly impact the safety and economics of operating power reactors. This paper reviews a process, employed by staff of Canadian Nuclear Safety Commission, for the evaluation and implementation of a new methodology for assessing flaws in operating CANDU pressure tubes against initiation of delayed hydride cracking. It, thus, illustrates from perspectives of regulatory authority staff, what areas are of the most concern in evaluating a new flaw assessment methodology, and what measures might be applied in order to minimize any possible risks or uncertainties associated with its applications. While the implementation of the new methodology has resulted in the avoidance of many unnecessary replacements of pressure tubes, recommendations from regulatory authority staff also lead to further understanding of the degradation mechanisms and to the foreseeing of challenges for long-term operation. The process and focal points of regulatory evaluation might need to be taken into consideration for future new assessment methodology developments for the licensees and their R&D community.
机译:对检测到的缺陷的充分评估是证明受影响部件的服务的适应性的关键步骤,从而确保核电厂的安全运行。对于某些关键结构,系统和组件,评估和配置的方法可能会显着影响操作电源反应堆的安全性和经济性。本文审查了加拿大核安全委员会工作人员的一项过程,用于评估和实施一种用于评估操作蜡烛压力管中的缺陷的新方法,从而对延迟氢化物裂解的启动。因此,它从监管机构工作人员的角度来看,哪些方面最关注的是评估新的缺陷评估方法,以及可能适用的措施,以尽量减少与其应用相关的任何可能的风险或不确定性。虽然新方法的实施导致了避免了许多不必要的压力替代压力管,但监管机构工作人员的建议也会导致进一步了解退化机制以及预见到长期运作的挑战。可能需要考虑监管评估的过程和联络点,以便未来为被许可人及其研发社区的新评估方法论发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号