首页> 外文会议>International conference on environmental remediation and radioactive waste management >THE OPTIMIZED RISK MANAGEMENT OF THE WASTE FROM TENORM AND NUCLEAR INDUSTRIES
【24h】

THE OPTIMIZED RISK MANAGEMENT OF THE WASTE FROM TENORM AND NUCLEAR INDUSTRIES

机译:Tenorm和核工业废物的优化风险管理

获取原文

摘要

We compared the existing regulation on management of radioactive and non-radioactive wastes with the ideal legislation procedures for protection of environment. The comparison revealed the necessity of risk-based regulation, consideration for ethics and cost-effectiveness of the regulation, and optimal usage of regulation resources. In order to assess the cost-effectiveness of several different waste disposal options, the concept of disposal cost per unit radiotoxicity (mSv or m~3) in waste (CPR hereafter) was introduced and calculated. The results revealed that current disposal option of high level radioactive waste (underground burial) was more cost-effective than that of TENORM and asbestos containing waste.
机译:我们将现有的放射性和非放射性废物管理规定与保护环境保护的理想立法程序。比较揭示了基于风险的规则,考虑道德规范的必要性,并对监管的伦理和成本效益以及监管资源的最佳利用。为了评估几种不同的废物处理选项的成本效益,引入并计算了废物(下文CPR)中每单位放射毒性(MSV或M〜3)的处理成本的概念。结果表明,高水平放射性废物(地下埋葬)的当前处置选择比含有废物的Tenorm和石棉更具成本效益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号