首页> 外文会议>International conference on ocean, offshore and arctic engineering;OMAE2011 >INSTALLATION OF A SUBMERGED BUOY FOR SUPPORTING RISERS (BSR) SYSTEM IN CAMPOS BASIN SITE
【24h】

INSTALLATION OF A SUBMERGED BUOY FOR SUPPORTING RISERS (BSR) SYSTEM IN CAMPOS BASIN SITE

机译:在CAMPOS盆地现场安装水下浮标支撑BSR(BSR)系统

获取原文

摘要

The BSR (Buoy for Supporting Risers) concept is composed by a submerged buoy anchored to the sea bottom by tethers and intended to support risers coming from the bottom (probably SCRs - Steel Catenary Risers) and going to the floating platform (probably with flexible jumpers). For the case under analysis here, the main dimensions of the BSR prototype are 27.2 m length × 27.2 m width ×5.0 m depth. The paper describes all final full scale installation step so that the BSR may be considered a suitable technology. The installation indeed was the great challenge of this design due the size of the hull. The present work also evaluates numerically and experimentally a specific new manner to install the BSR with the support of auxiliary mooring lines among with the four tethers connected to it. One of the installation premises was to make use of Anchor Handling Supply Vessels instead of Crane Vessels. After this numerical analysis, the work went on by performing model tests that simulates the operation in a deep water model basin using 1:40 scale. The model test anticipated several problems such as the chain stopper weakness in the operation and others as discussed in this paper. As a conclusion the work was devised the most important parameters during the system installation and suggested ways to improve the methodology. In November 2009 the BSR was installed in 500 m of water depth at Congro field location, Campos Basin, offshore Brazil. The tethers were adjusted in January 2010 and in March 2010 two risers were installed. Thenceforward the last edge of this knowledge was considered over passed.
机译:BSR(支撑立管浮标)概念是由一根系绳固定在海底的浮标组成,旨在支撑从底部出来的立管(可能是SCR-钢悬链立管)并到达浮动平台(可能带有柔性跳线) )。对于此处要分析的情况,BSR原型的主要尺寸为27.2 m长×27.2 m宽×5.0 m深度。本文介绍了所有最终的满量程安装步骤,以便可以将BSR视为合适的技术。由于船体的尺寸,安装确实是这种设计的最大挑战。本工作还在数值和实验上评估了一种特殊的新方式来安装BSR,该方式是通过辅助系泊缆线以及与之连接的四个系绳之间的支撑来进行的。安装场所之一是使用锚索供应船代替起重机船。经过此数值分析后,通过执行模型测试继续进行工作,该模型测试使用1:40比例模拟深水模型盆地中的操作。模型测试预期了一些问题,例如链条塞在操作中的无力以及本文中讨论的其他问题。作为结论,这项工作是在系统安装过程中设计的最重要的参数,并提出了改进方法的建议方法。 BSR于2009年11月安装在巴西近海Campos盆地Congro油田水深500 m处。系绳于2010年1月进行了调整,2010年3月安装了两个立管。因此,这种知识的最后优势被认为是过去了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信