首页> 外文会议>Annual highway geology symposium >A Challenging Emergency Rockfall Project Along The North Cascades Highway, Washington
【24h】

A Challenging Emergency Rockfall Project Along The North Cascades Highway, Washington

机译:华盛顿北部瀑布沿北瀑布的紧急岩石项目

获取原文

摘要

In December, 2014 the WSDOT Geotechnical Office was requested to inspect a rock slide that occurred at a previously known unstable slope location along State Route 20 near mile post 142.7, in the North Cascades, Washington. Fortunately, this slope was located along a section of the highway that was closed for the winter. Our initial on-highway review indicated that approximately 7500 yds~3 of material failed from the slope and came to rest on the highway. Our on-slope inspection revealed that approximately 11,000 yds~3 of highly distressed phyllitic rock remained on the slope, bound upslope by a +5-ft-wide tension crack. The tension crack was located approximately 100 feet above the highway and was about 70 feet long. The detached rock mass was perched on an irregular set of joints dipping adversely out of the slope at roughly 50°. There were indications that the rock mass had moved since the initial failure, or was still moving. Through repeated ground-based LiDAR scans over several months, several feet of additional movement was measured without the occurrence of a catastrophic failure. This emergency mitigation project had significant issues to overcome that included safety and environmental concerns, contracting issues, weather, and pressure to open the highway early due to a mild winter. The slope remediation included conventional surveying and routine ground-based LiDAR scanning to monitor for slope deformation, and the use of a long-reach excavator, slope scaling, surface and trim blasting, debris removal, and slope reinforcement to stabilize the slope.
机译:2014年12月,要求WSDOT岩土工程办公室检查岩石幻灯片,该岩石幻灯片在华盛顿北瀑布北瀑布附近的州立路线20附近的国家路线20。幸运的是,这个斜坡沿着冬季关闭的高速公路的一部分。我们的首次公路评论表明,大约7500 yds〜3的材料从斜坡上失败,并在高速公路上休息。我们的斜坡检测显示,大约11,000毫克〜3的高度苦恼的植物岩石仍然在斜坡上,通过+ 5英尺宽的张力裂缝结合起伏。张力裂缝位于高速公路上方约100英尺,长约70英尺长。在大约50°的斜坡上倾斜的不规则关节上栖息出分离的岩石质量。有迹象表明,由于初始失败,岩石群体已经移动,或者仍在移动。通过多个月的重复地基的潮流扫描,测量了几英尺的额外运动,而不会发生灾难性失败。这种紧急缓解项目具有重要的问题,以克服,包括安全和环境问题,承包问题,天气以及由于冬季轻微开放高速公路。斜坡修复包括常规测量和常规地面的LIDAR扫描,以监测斜坡变形,以及使用长伸展挖掘机,斜率缩放,表面和修剪爆破,碎屑去除和坡度加固,以稳定斜坡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号