The Anatomy of A Challenging Construction Project, Extension of the Roadway Across a Celery Bog, West Lafayette, Indiana

机译:一个具有挑战性的建筑项目的解剖学,在芹菜沼泽,西拉斐特,印第安纳州的巷道延伸

获取原文

摘要

Rapid population growth of West Lafayette, IN, adjacent to Purdue University, required the city to widen the road across the Celery Bog from two lanes to four. Celery Bog is a marsh containing thick deposits of peat and marl that fill a large kettle lake of Wisconsin age. Distance across the bog was about 800 feet. An embankment was required to raise the elevation of the road and to extend it from two lanes to four. The embankment portion across the bog failed as a classic rotational slump during construction. Some concerns have arisen in retrospect regarding the thoroughness of the exploration program, laboratory testing prior to construction, earthwork placement, and construction supervision. Next, to stabilize the bog crossing, grout columns were placed through the soft soils into the glacial till below. However, the subgrade mat below the pavement failed to transfer loads onto the piles, placed at six-foot centers, causing the road to develop a washboard effect. In an attempt to add stiffness to the subgrade the city repaved the road with an asphalt overlay but the washboard effect returned. As a last resort a bridge was constructed over the bog, which nearly doubled the cost of the road-widening project. Steel H-piles approximately 100 feet in length, were driven into the glacial till and gravel layer to support the bridge. The original cost of about S3 million was increased to about $ 12 million for the total road project extending about 6350 feet in length. Litigation between the contractor and the state highway department was conducted in an attempt to determine the cause of failures and the level of responsibility.
机译:西拉斐特的迅速增长,毗邻普渡大学,要求城市从两个车道到四个路线扩大芹菜沼泽的道路。 CELERY BOG是一个含有厚厚的泥炭矿床的沼泽,填充了威斯康星州的大型水壶湖。距离沼泽的距离约为800英尺。需要一个堤防来提高道路的高度并将其从两个车道延伸到四个。横跨沼泽的堤防部分在施工期间被视为经典的旋转坍落度。一些担忧在回顾勘探计划的彻底性,建设前,土工放置和施工监督之前的实验室测试。接下来,为了稳定沼泽交叉,将灌浆柱通过软土放入冰川到下方。然而,路面下方的路基垫未能将载荷转移到桩上,放置在六英尺的中心,导致道路开发搓板效应。为了将刚度添加到路基上,这座城市用沥青覆盖物倒退了,但返回了搓板效果。作为最后的手段,桥梁是在沼泽地建造的,这几乎加倍道路扩大项目的成本。钢H-桩长约100英尺,被驱动到冰川耕地和砾石层中以支撑桥梁。总路程的原价约为3350亿美元,总长度为约6350英尺。承包商与州公路部门之间的诉讼是为了确定失败和责任水平的原因。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号