首页> 外文会议>Annual highway geology symposium >Case Studies on Rockfall Mitigation and Rock Slope Stabilization in California, Tennessee, Virginia, and Vermont
【24h】

Case Studies on Rockfall Mitigation and Rock Slope Stabilization in California, Tennessee, Virginia, and Vermont

机译:加州,田纳西州,弗吉尼亚州和佛蒙特州岩石缓解和岩石坡稳定的案例研究

获取原文

摘要

Rockfall constitutes a major hazard along our nation's roadways and a nagging liability to our maintenance and engineering departments. Recurring cleanup and repair costs have stressed dwindling maintenance budgets. The extensive nature of the problem precludes repairing and mitigating every possible site, but new and innovative mitigation technologies and contracting techniques can serve to stretch tight budgets. There are many methods that can be used to stabilize a rock slope. These include altering the slope geometry, installing drains, adding reinforcement, or a combination of these methods. The challenge for engineers is to design a method that can be installed with little or no impact to the traveling public, is expedited through innovative contracting methods, limits the disturbance to environmentally sensitive areas, and maintains an aesthetically pleasant appearance and appropriate service life. This presentation covers four case studies that highlight innovative technology and innovative contracting methods for rockfall mitigation. The case studies include a project for the United States Army Corps of Engineers near Chowchilla, CA using design/build/warranty contracting and post-tensioned rock bolts with Maccaferri B600 mesh facing; a project for the Tennessee Department of Transportation near Maryville, TN using rock dowels and Geobrugg's high-capacity Tecco? mesh facing; a design/build project for the Virginia Department of Transportation near Hillsville, VA using a shear dowel array encased in reinforced shotcrete overlying a drilled drainage array; and an emergency design/build rockfall mitigation project for the Vermont Agency of Transportation that used a shear key, scaling, vegetation removal, rock dowels, and both wet and dry mix shotcrete.
机译:岩石沿着我们国家道路的主要危害以及对我们的维护和工程部门的唠叨责任。经常性清理和维修成本强调了DWWINDLING维护预算。问题的广泛性质排除了修复和缓解了每个可能的网站,但新的和创新的缓解技术和承包技术可以用于延长预算紧张。有许多方法可用于稳定摇滚斜率。这些包括改变斜坡几何形状,安装漏斗,加入钢筋或这些方法的组合。工程师的挑战是设计一种可以通过创新的承包方法加急,对旅行公众进行很少或没有影响的方法,限制对环境敏感区域的干扰,并保持美观的外观和适当的使用寿命。本演示文稿涵盖了四种案例研究,突出了岩石缓解的创新技术和创新的承包方法。案例研究包括美国陆军工程师的项目,附近的Chowchilla,CA附近,使用设计/打造/保修合同和张贴岩石螺栓,与Maccaferri B600网格面朝上; Maryville附近的田纳西州交通部的项目,TN采用岩石销钉和Geobrugg的高容量Tecco?网眼面向网格;弗吉尼亚州弗吉尼亚州交通部的设计/构建项目,VA附近的VA覆盖在钻孔排水阵列中的剪切定位阵列;和佛蒙特州运输机构的紧急设计/打造岩石缓解项目,用于使用剪切钥匙,缩放,植被去除,岩销销钉,湿润和干混射击。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号