【24h】

Telepower cost benefit model

机译:电信成本效益模型

获取原文

摘要

A Telepower cost benefit model has been developed to predict changes in OPEX and CAPEX expenditure in relation to Telecoms network reliability. The development is based on an advanced simulation engine which models the complex interactions of operational and capital expenditure effects on batteries, rectifiers, solar systems and other telecommunications infrastructure. The effects of business expenditure and its actual impact in the areas of critical power infrastructure may be calculated prior to the cost decision being implemented. The model permits the application of many different reliability and cost scenarios to arrive at a suitable trade-off between cost and reliability.
机译:已经开发了一种Telepower成本效益模型,以预测与电信网络可靠性相关的OPEX和CAPEX支出的变化。该开发基于先进的仿真引擎,该引擎对电池,整流器,太阳能系统和其他电信基础设施上运营和资本支出影响的复杂相互作用进行建模。在实施成本决策之前,可以计算业务支出的影响及其在关键电力基础设施领域的实际影响。该模型允许应用许多不同的可靠性和成本方案,以在成本和可靠性之间进行适当的权衡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号