NEAR FAILURE OF THE ALL AMERICAN CANAL IN SOUTHERN CALIFORNIA DUE TO A 7.2 MAGNITUDE EARTHQUAKE IN APRIL, 2010

机译:由于2010年4月,南加州所有美国运河近期失败

获取原文

摘要

On Easter Sunday, 2010, a 7.2 magnitude earthquake struck northern Mexico near Mexicali. The All-American Canal, which diverts Colorado River water from the Imperial Reservoir and delivers irrigation water throughout the Imperial Valley, was heavily damaged. The canal parallels the California/Mexico border and the siphon carries water across the New River in southern California only 22 miles from the earthquake epicenter. The earthquake damaged the concrete canal lining, separated vertical and horizontal joints at the inlet of the siphon and wasteway, liquefied materials in the New River channel, and opened up wide cracks and fissures in the 40-foot-high embankment fill and riverbank supporting the canal, gate structure, siphon and wasteway. Concentrated seepage was observed exiting near the toe of the embankment fill between the siphon and the wasteway. Many aftershocks occurred, but the seepage remained steady for another week after the April 4~(th) main shock. Eight days after the initial earthquake, the quantity of seepage suddenly increased approximately ten fold. That evening a significant aftershock of 4.8 magnitude occurred, and the seepage increased even more causing internal erosion of embankment materials to begin in earnest. This paper discusses the incident, what mitigation actions were taken that night to save the siphon structure, follow-up investigations and continuing engineering studies.
机译:在2010年的复活节星期日,墨西哥附近墨西哥北部的7.2大地震。从帝国水库转移科罗拉多河水并在整个帝国山谷中提供灌溉水的全美运河受到严重损坏。 Canal Parallels加州/墨西哥边境和虹吸管在南加州南部的新河上携带水,距离地震震中仅22英里。地震损坏了虹吸管和废气的入口处的混凝土管衬里,分离的垂直和水平接头,新河道的液化材料,在40英尺高的路堤填充和河岸的宽敞裂缝和裂缝中开放运河,门结构,虹吸和垃圾和污水。观察到浓缩的渗流在虹吸管和废气之间的路堤填充的脚趾附近。发生了许多余震,但在4月4日〜(th)主要休克后,渗流仍然保持稳定。初始地震后八天,渗流量突然增加约十倍。那天晚上发生了4.8幅度的显着余震,渗漏甚至更加导致堤防材料的内部侵蚀,以获得最终开始。本文讨论了这一事件,夜间采取了缓解行动,以节省虹吸结构,后续调查和持续的工程研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号