首页> 外文会议>Annual USSD conference >IMPACTS OF POOL RESTRICTIONS ON THECUMBERLAND RIVER BASIN RESERVOIR SYSTEM OPERATION
【24h】

IMPACTS OF POOL RESTRICTIONS ON THECUMBERLAND RIVER BASIN RESERVOIR SYSTEM OPERATION

机译:泳池限制对小溪河流域水库系统运行的影响

获取原文

摘要

The Nashville District of the Corps of Engineers (Corps) operates a system of ten multipurpose water resources projects in the 17,913 mi2 Cumberland River Basin. Two dams in this system, Wolf Creek Dam on the Cumberland River near Jamestown, KY and Center Hill Dam on the Caney Fork River near Lancaster, TN, have been classified as Dam Safety Action Classification-1 (DSAC-1) structures. In 2007 pool restrictions were implemented at both projects as part of an overall interim risk reduction effort. These restrictions severely impacted the operation of the entire Cumberland River Basin reservoir system. Therefore, Nashville District prepared and circulated for public and agency review an Interim Operating Plan to address operation of the reservoir system during the pool restriction period. One of the major components of this plan was to establish an order of priority for management of the available water. Dam safety and flood damage reduction continue to be the top system priorities. Otherwise, the order is 1) water supply; 2) water quality; 3) navigation; 4) hydropower; and 5) recreation. A combination of pool drawdowns at the two largest storage projects within the reservoir system and a prolonged period of moderate to severe drought resulted in severe impacts to the volume and location of available water in 2007 and 2008. This resulted in new and innovative operations at several projects within the reservoir system as water managers reacted to dynamic demands for water. The reservoir system continued to meet the primary needs of the region without acute environmental consequences despite significant impacts to several operating objectives.
机译:工程师队(Corps)的纳什维尔区经营了17,913 Mi2坎伯兰河流域十个多用途水资源项目系统。这款系统中的两个水坝,在詹姆斯敦附近的坎伯兰河附近的坎伯兰河上的狼溪大坝在兰开斯特,TN附近的甘蓝叉河上的坎梅尔克河上,已被归类为大坝安全动作分类-1(DSAC-1)结构。 2007年,泳池限制在两个项目中实施,作为整体临时风险减少努力的一部分。这些限制严重影响了整个坎伯兰河流域水库系统的运作。因此,纳什维尔区为公共和机构编制和分发,审查临时运营计划,以解决池限制期间储层系统的运作。该计划的主要组成部分是建立可用水管理的优先顺序。大坝安全和洪水损害减少继续成为顶级系统优先事项。否则,订单为1)供水; 2)水质; 3)导航; 4)水电;和5)娱乐。在储层系统内的两个最大的存储项目中的泳池缩减组合和长期的中度至严重干旱导致2007年和2008年可用水的体积和位置产生严重影响。这导致了几个新的和创新的行动水库系统内的项目,因为水管理人员对水的动态需求作出反应。尽管对几种经营目标产生重大影响,但储层系统继续满足该地区的主要需求,而无需急性环境后果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号