How to assign cost to “avoidable requirements creep”: A step towards the waterfall''s agilization

机译:如何为“可避免的需求蔓延”分配成本:迈向瀑布敏捷化的一步

获取原文

摘要

Scope creep is a major risk in fixed price projects. It has been suggested to distinguish between so-called “avoidable creep” and “unavoidable creep” where “avoidable creep” results from stopping requirements engineering (RE) effort too early e.g. for cost-saving reasons. However, no suggestion has been made how to assign cost to “avoidable creep” to quantify the consequence of too early stopped RE effort and to get that type of creep managed or even considerably reduced. From our experience in real and large fixed price projects, we derived a suggestion for solving this problem as soon as possible. The suggested solution has not yet been tried out in practice. However, with this paper we would like to begin a discussion about the suggested solution, and whether it could solve the problem of valuating “avoidable creep”, could thereby reduce both the customer''s and the supplier''s risk in large fixed price projects and, as a side-effect, serves as a step in converging pure waterfall and pure agile procedures.
机译:范围攀升是固定价格项目中的主要风险。已经建议区分所谓的“可避免的蠕变”和“不可避免的蠕变”,其中“可避免的蠕变”是由于过早地停止需求工程(RE)工作而产生的,例如出于节省成本的原因。但是,没有建议如何将成本分配给“可避免的蠕变”以量化过早停止的可再生能源工作的后果,以及如何使这种蠕变得到管理或什至大大减少。根据我们在实际和大型固定价格项目中的经验,我们提出了尽快解决此问题的建议。建议的解决方案尚未在实践中试用。但是,在本文中,我们将开始讨论建议的解决方案,以及该解决方案是否可以解决评估“可避免的蠕变”的问题,从而可以降低大型固定资产中客户和供应商的风险价格项目,并且作为副作用,是融合纯瀑布和纯敏捷过程的一步。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号