Research on EPCM project procurement risk based on TOPSIS and RBF method

机译:基于TOPSIS和RBF方法的EPCM项目采购风险研究

获取原文

摘要

Procurement is a core link under the EPCM model. Identifying and analyzing procurement risk is of significance to make sensible procurement decision. This paper analyzes the procurement risk under the EPCM model at first. According to the above, the writer proposed a procurement risk assessment model based on TOPSIS and RBF method, and connected with the engineering examples, made empirical analysis based on a certain amount of project procurement statistics data. The whole research shows that the new method leads to a more efficient and exact assessment for the procurement risk under the EPCM model, and meanwhile, it could provide strong support structure for the implementation of integrated procurement risk management and the establishment of financial risk early warning mechanism.
机译:采购是EPCM模式下的核心环节。识别和分析采购风险对于做出明智的采购决策具有重要意义。本文首先对EPCM模式下的采购风险进行了分析。据此,笔者提出了一种基于TOPSIS和RBF方法的采购风险评估模型,并结合工程实例,基于一定数量的项目采购统计数据进行了实证分析。整体研究表明,该新方法可以在EPCM模式下对采购风险进行更有效,更准确的评估,同时也可以为实施综合采购风险管理和建立财务风险预警提供强有力的支持结构。机制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号