Engineering Materials Management Pattern Research and Implementation for Generation III Nuclear Power Plant

机译:第三代核电厂工程材料管理模式研究与实现

获取原文

摘要

The construction of a nuclear power plant is a very complex systematic project, mainly including engineering, procurement, construction and start-up phases. Among those stages, engineering materials management is a fundamental and decisive job. In this paper, the engineering materials' properties are researched. In order to manage the engineering materials in VPRM efficiently, we proposed the nuclear power plant engineering materials classification method, and developed three kinds of workflow based on VPRM, effectively solved the problems of engineering materials management of the third generation nuclear power plant. In the paper an example of the third generation nuclear power plant engineering materials management application is given, which namely the Taishan Nuclear Power Plant Engineering Management System.
机译:核电厂的建设是一个非常复杂的系统项目,主要包括工程,采购,建设和启动阶段。在这些阶段中,工程材料管理是一项基本而决定性的工作。本文对工程材料的性能进行了研究。为了有效地管理VPRM中的工程材料,我们提出了核电厂工程材料的分类方法,并开发了基于VPRM的三种工作流程,有效地解决了第三代核电厂工程材料管理的问题。本文以第三代核电站工程材料管理应用为例,即台山核电站工程管理系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号